Assessment Year | 1998 |
---|---|
Principal Product | Printed Paper Inserts |
NAICS |
n/a
|
SIC | 2759: Commercial Printing, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
72,528
ft2
|
Annual Production | 1,343,171,090
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $510,075 | 10,548,652 |
kWh
|
$0.048 |
Electricity Demand | $187,888 | 22,029 |
kW-mo/yr
|
$8.53 |
Natural Gas | $355,593 | 58,734 |
MMBtu
|
$6.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $295,031 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $239,121 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,004 | $7,226 |
$3,094
64,478
kWh
|
$910
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,672 | $1,458 |
$2,148
44,842
kWh
|
$524
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,742 | $3,800 |
$13,119
273,447
kWh
|
$3,223
-
kW-mo/yr
|
$(-3,600.0) | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,779 | - |
$2,779
42,204
kWh
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $2,297 | $750 |
$2,297
47,773
kWh
|
- | - | |
06 | 2.4133: Use most efficient type of electric motors | $1,188 | $642 |
$882
18,464
kWh
|
$306
-
kW-mo/yr
|
- | |
07 | 2.3212: Optimize plant power factor | $1,623 | $5,000 | - | - | $1,623 | |
08 | 2.2693: Use waste heat steam for absorption refrigeration | $14,651 | $28,996 |
$32,778
682,884
kWh
|
$22,536
-
kW-mo/yr
|
$(-40,663.0) | |
09 | 3.4116: Meter recycled water (to reduce sewer charges) | $1,843 | $1,500 | - | - | $1,843 | |
10 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,727 | - | - | - | $2,727 | |
11 | 4.231: Purchase equipment instead of leasing | $39,900 | $123,000 | - | - | $39,900 | |
12 | 4.812: Apply for investment incentives | $36,605 | $50 | - | - | $36,605 | |
13 | 4.522: Modify storage space to avoid rental of a warehouse | $172,000 | $150,000 | - | - | $172,000 | |
TOTAL RECOMMENDED | $295,031 | $322,422 |
$57,097
1,174,092
kWh
|
$27,499
-
kW-mo/yr
|
$210,435 | ||
TOTAL IMPLEMENTED | $239,121 | $286,234 |
$23,437
472,744
kWh
|
$4,657
-
kW-mo/yr
|
$211,027 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs