ITAC Assessment: UF0211
ITAC logo
ITAC Assessment: UF0211
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Printed Paper Inserts
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 72,528
ft2
Annual Production 1,343,171,090
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $510,075 10,548,652
kWh
Electricity Demand $187,888 22,029
kW-mo/yr
Natural Gas $355,593 58,734
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $295,031 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $239,121

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,004 $7,226 $3,094
64,478
kWh
$910
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,672 $1,458 $2,148
44,842
kWh
$524
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,742 $3,800 $13,119
273,447
kWh
$3,223
-
kW-mo/yr
$(-3,600.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,779 - $2,779
42,204
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $2,297 $750 $2,297
47,773
kWh
- -
06 2.4133: Use most efficient type of electric motors $1,188 $642 $882
18,464
kWh
$306
-
kW-mo/yr
-
07 2.3212: Optimize plant power factor $1,623 $5,000 - - $1,623
08 2.2693: Use waste heat steam for absorption refrigeration $14,651 $28,996 $32,778
682,884
kWh
$22,536
-
kW-mo/yr
$(-40,663.0)
09 3.4116: Meter recycled water (to reduce sewer charges) $1,843 $1,500 - - $1,843
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,727 - - - $2,727
11 4.231: Purchase equipment instead of leasing $39,900 $123,000 - - $39,900
12 4.812: Apply for investment incentives $36,605 $50 - - $36,605
13 4.522: Modify storage space to avoid rental of a warehouse $172,000 $150,000 - - $172,000
TOTAL RECOMMENDED $295,031 $322,422 $57,097
1,174,092
kWh
$27,499
-
kW-mo/yr
$210,435
TOTAL IMPLEMENTED $239,121 $286,234 $23,437
472,744
kWh
$4,657
-
kW-mo/yr
$211,027
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs