ITAC Assessment: UF0200
ITAC logo
ITAC Assessment: UF0200
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Bottled Water
NAICS
n/a
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 250,000
ft2
Annual Production 27,000,000
pieces
Production Hrs. Annual 7,280
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $544,973 9,503,810
kWh
Electricity Demand $96,842 21,440
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $512,325 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,650

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,619 $5,500 $6,673
116,940
kWh
$946
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $19,378 $452 $17,138
300,703
kWh
$2,240
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,894 $7,557 $3,390
59,496
kWh
$504
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,773 $2,350 $18,773
276,084
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $987 $1,000 $987
17,292
kWh
- - -
06 2.4226: Use / purchase optimum sized compressor $3,909 $2,000 $3,909
68,581
kWh
- - -
07 3.4151: Minimize water usage $2,198 $3,300 - - $2,198
-
Tgal
-
08 3.4116: Meter recycled water (to reduce sewer charges) $1,312 $1,400 - - - $1,312
09 2.8121: Apply for tax-free status for energy purchases $31,565 $1,000 - - - $31,565
10 4.522: Modify storage space to avoid rental of a warehouse $374,690 $234,600 - - - $374,690
11 4.231: Purchase equipment instead of leasing $48,000 $32,800 - - - $48,000
TOTAL RECOMMENDED $512,325 $291,959 $50,870
839,096
kWh
$3,690
-
kW-mo/yr
$2,198
-
Tgal
$455,567
TOTAL IMPLEMENTED $51,650 $4,750 $18,773
276,084
kWh
- - $32,877
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs