Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Water Pumps
NAICS 333996: Fluid Power Pump and Motor Manufacturing
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 15
Plant Area 466,864
ft2
Annual Production 4,754
units
Production Hrs. Annual 2,080
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,828 486,533
kWh
Electricity Demand $21,912 2,003
kW-mo/yr
Electricity Fees $10,768 -
Natural Gas $1,071 120
MMBtu
LPG $7,351 209
MMBtu
Fuel Oil #1 $33,633 1,806
MMBtu
Waste Disposal Costs
Solid Waste (non-haz) $15,600 915,931
lb
TOTAL YEARLY COSTS $117,163
RECOMMENDED SAVINGS* $54,730 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,913

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings By-product Production Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $5,354 $640 $2,739
49,804
kWh
$2,615
-
kW-mo/yr
- - - -
02 2.3191: Use demand controller or load shedder $3,407 $2,618 $1,873
34,057
kWh
$1,534
-
kW-mo/yr
- - - -
03 2.6242: Minimize operation of equipment maintained in standby condition $3,363 - - - $3,363
-
MMBtu
- - -
04 2.4226: Use / purchase optimum sized compressor $3,190 $15,730 $1,632
29,679
kWh
$1,558
-
kW-mo/yr
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,991 $304 $1,991
36,200
kWh
- - - - -
06 2.4239: Eliminate or reduce compressed air usage $1,972 - $1,972
35,862
kWh
- - - - -
07 2.7141: Lower light fixtures in high ceiling areas $1,440 $3,987 $802
14,580
kWh
$638
-
kW-mo/yr
- - - -
08 2.7135: Install occupancy sensors $1,187 $4,373 $1,187
21,577
kWh
- - - - -
09 2.7425: Clean or color roof to reduce solar load $1,049 $200 $1,049
19,078
kWh
- - - - -
10 4.311: Schedule deliveries according to demand $3,120 $2,528 - - - - $3,120 -
11 3.5311: Recover and reuse waste material $28,657 $31,000 $(-386.0)
(-7,020)
kWh
$(-5,906.5)
-
kW-mo/yr
- $15,600
-
lb
- $19,349
TOTAL RECOMMENDED $54,730 $61,380 $12,859
233,817
kWh
$439
-
kW-mo/yr
$3,363
-
MMBtu
$15,600
-
lb
$3,120 $19,349
TOTAL IMPLEMENTED $48,913 $37,290 $9,238
167,981
kWh
$(-1,757.1)
-
kW-mo/yr
$3,363
-
MMBtu
$15,600
-
lb
$3,120 $19,349
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings By-product Production Savings