ITAC Assessment: UF0063
ITAC logo
ITAC Assessment: UF0063
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Boats
NAICS
n/a
SIC 3731: Ship Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 550
Plant Area 500,000
ft2
Annual Production 3,500
pieces
Production Hrs. Annual 3,640
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $337,856 5,614,009
kWh
Natural Gas $868 127
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $116,911 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,359 $5,917 $6,359
106,096
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,652 $5,262 $1,652
27,550
kWh
03 2.6231: Utilize controls to operate equipment only when needed $11,110 $13,200 $11,110
185,229
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $180 $306 $180
2,931
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $260 $480 $260
4,396
kWh
06 2.4133: Use most efficient type of electric motors $2,939 $25,197 $2,939
48,945
kWh
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,616 $2,550 $1,616
26,964
kWh
08 2.6127: Maintain air filters by cleaning or replacement $13,151 $2,000 $13,151
219,226
kWh
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,546 $2,000 $5,546
92,321
kWh
10 2.6231: Utilize controls to operate equipment only when needed $3,712 $1,000 $3,712
31,946
kWh
11 2.7232: Replace existing hvac unit with high efficiency model $3,659 $2,850 $3,659
60,961
kWh
12 2.7261: Install timers and/or thermostats $1,081 $1,300 $1,081
17,878
kWh
13 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,265 - $2,265
-
kWh
14 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $1,560 $1,400 $1,560
26,084
kWh
15 2.6242: Minimize operation of equipment maintained in standby condition $61,821 $250,000 $61,821
-
kWh
TOTAL RECOMMENDED $116,911 $313,462 $116,911
850,527
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs