ITAC Assessment: AM0156
ITAC logo
ITAC Assessment: AM0156
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SALT FOR ANIMAL CONSUMPTION
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $5
M
to 10
M
# of Employees 51
Plant Area
n/a
Annual Production 113,000
ton
Production Hrs. Annual 4,482
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,050 3,135,991
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,872 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,182

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.3134: Shift from daytime to nighttime operation $8,260 - $10,850
-
kWh
$(-2,590.0)
02 2.3212: Optimize plant power factor $10,125 $1,500 $10,125
-
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,117 $3,200 $3,108
51,583
kWh
$2,009
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,040 $860 $4,040
106,975
kWh
-
05 2.6232: Install set-back timers $2,900 - $2,900
76,202
kWh
-
06 2.4312: Improve lubrication practices $1,430 - $1,430
26,964
kWh
-
TOTAL RECOMMENDED $31,872 $5,560 $32,453
261,724
kWh
$(-581.0)
TOTAL IMPLEMENTED $22,182 $5,560 $20,173
234,760
kWh
$2,009
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs