Assessment Year | 2006 |
---|---|
Principal Product | Directional Drills and Boring Machines |
NAICS | 333999: All Other Miscellaneous General Purpose Machinery Manufacturing |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
100,000
ft2
|
Annual Production | 170
pieces
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $156,359 | 1,803,228 |
kWh
|
$0.087 |
Natural Gas | $125,832 | 10,459 |
MMBtu
|
$12.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,962 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $33,962 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,473 | $40,463 |
$5,148
257,400
kWh
|
$10,787
-
kW-mo/yr
|
$2,538 | |
02 | 2.8114: Change rate schedules or other changes in utility service | $7,542 | - | - | - | $7,542 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,798 | $225 |
$1,227
61,380
kWh
|
$2,571
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,557 | - |
$1,727
86,350
kWh
|
$830
-
kW-mo/yr
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,592 | - |
$375
18,755
kWh
|
$1,217
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $33,962 | $40,688 |
$8,477
423,885
kWh
|
$15,405
-
kW-mo/yr
|
$10,080 | ||
TOTAL IMPLEMENTED | $33,962 | $40,688 |
$8,477
423,885
kWh
|
$15,405
-
kW-mo/yr
|
$10,080 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs