ITAC Assessment: UD0752
ITAC logo
ITAC Assessment: UD0752
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Directional Drills and Boring Machines
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 100,000
ft2
Annual Production 170
pieces
Production Hrs. Annual 6,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,359 1,803,228
kWh
Natural Gas $125,832 10,459
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,962 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,962

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,473 $40,463 $5,148
257,400
kWh
$10,787
-
kW-mo/yr
$2,538
02 2.8114: Change rate schedules or other changes in utility service $7,542 - - - $7,542
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,798 $225 $1,227
61,380
kWh
$2,571
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,557 - $1,727
86,350
kWh
$830
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,592 - $375
18,755
kWh
$1,217
-
kW-mo/yr
-
TOTAL RECOMMENDED $33,962 $40,688 $8,477
423,885
kWh
$15,405
-
kW-mo/yr
$10,080
TOTAL IMPLEMENTED $33,962 $40,688 $8,477
423,885
kWh
$15,405
-
kW-mo/yr
$10,080
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs