| Assessment Year | 1992 |
|---|---|
| Principal Product | DRAPES,SHADES AND BLINDS |
| NAICS |
n/a
|
| SIC | 2591: Drapery Hardware and Window Blinds and Shades |
| Sales Range | $5 M to 10M |
| # of Employees | 84 |
| Plant Area |
n/a
|
| Annual Production | 131,000
pieces
|
| Production Hrs. Annual | 2,535
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $33,216 | 340,270 |
kWh
|
$0.098 |
| Fuel Oil #2 | $389 | 63 |
MMBtu
|
$6.17 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,471 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,488 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $473 | $336 |
$473
3,810
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $72 | $2,138 |
$72
879
kWh
|
- | |
| 03 | 2.7233: Use properly designed and sized hvac equipment | $4,172 | $3,140 |
$4,172
42,497
kWh
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,480 | $500 |
$2,480
25,205
kWh
|
- | |
| 05 | 2.7492: Use proper thickness of insulation on building envelope | $6,911 | $10,120 |
$6,911
70,633
kWh
|
- | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $22 | $100 |
$22
293
kWh
|
- | |
| 07 | 2.6242: Minimize operation of equipment maintained in standby condition | $341 | - | - |
$341
-
MMBtu
|
|
| TOTAL RECOMMENDED | $14,471 | $16,334 |
$14,130
143,317
kWh
|
$341
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $7,488 | $4,076 |
$7,147
71,805
kWh
|
$341
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs