ITAC Assessment: UF0034
ITAC logo
ITAC Assessment: UF0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SNACK FOOD
NAICS
n/a
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area
n/a
Annual Production 187,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $416,968 8,816,237
kWh
Natural Gas $672,965 240,071
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,749 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,460

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,358 - $5,358
-
kWh
-
02 2.7233: Use properly designed and sized hvac equipment $11,737 $14,960 $11,737
192,849
kWh
-
03 2.4133: Use most efficient type of electric motors $2,962 $18,601 $2,962
48,652
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $1,299 $400 $1,299
21,395
kWh
-
05 2.7251: Reduce air conditioning load by evaporating water from roof $51,194 $68,400 $51,194
742,380
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $3,213 $1,000 - $3,213
-
MMBtu
07 2.2437: Recover waste heat from equipment $7,986 $5,200 - $7,986
-
MMBtu
TOTAL RECOMMENDED $83,749 $108,561 $72,550
1,005,276
kWh
$11,199
-
MMBtu
TOTAL IMPLEMENTED $15,460 $25,201 $4,261
70,047
kWh
$11,199
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs