ITAC Assessment: UF0010
ITAC logo
ITAC Assessment: UF0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FREEZERS AND COOLERS
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $5
M
to 10
M
# of Employees 94
Plant Area
n/a
Annual Production 1,550
pieces
Production Hrs. Annual 4,400
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,333 492,966
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,735 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,735

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7144: Install spectral reflectors / delamp $5,576 $2,795 $5,576
84,408
kWh
02 2.6232: Install set-back timers $185 $192 $185
2,931
kWh
03 2.4133: Use most efficient type of electric motors $121 $149 $121
1,758
kWh
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,610 - $2,610
-
kWh
05 2.7233: Use properly designed and sized hvac equipment $158 $176 $158
2,345
kWh
06 2.4221: Install compressor air intakes in coolest locations $85 $300 $85
1,172
kWh
TOTAL RECOMMENDED $8,735 $3,612 $8,735
92,614
kWh
TOTAL IMPLEMENTED $8,735 $3,612 $8,735
92,614
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs