Assessment Year | 2022 |
---|---|
Principal Product | Truck Assembly / Painting |
NAICS | 336120: Heavy Duty Truck Manufacturing |
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | greater than $500 M |
# of Employees | 824 |
Plant Area |
3,200,000
ft2
|
Annual Production | 25,133
units
|
Production Hrs. Annual | 1,920
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $2,115,726 | 51,994,346 |
kWh
|
$0.041 | |
Electricity Demand | $722,765 | 103,548 |
kW-mo/yr
|
$6.98 | |
Electricity Fees | $84,020 | - |
|
- | |
Natural Gas | $1,491,675 | 288,972 |
MMBtu
|
$5.16 | |
Waste Disposal Costs | |||||
Water Usage | $190,919 | 37,866 |
Tgal
|
$5.04 | |
TOTAL YEARLY COSTS | $4,605,105 | ||||
RECOMMENDED SAVINGS* | $977,649 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $609,534 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $22,214 | $200,000 | - |
$22,214
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.8114: Change rate schedules or other changes in utility service | $18,323 | - | - | - | $18,323 | - | - | - | - | |
03 | 2.1116: Improve combustion control capability | $261,813 | $100 | - | - | - |
$261,813
-
MMBtu
|
- | - | - | |
04 | 2.4131: Size electric motors for peak operating efficiency | $43,076 | $3,500 |
$32,989
751,458
kWh
|
$10,087
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,795 | $3,279 |
$2,295
52,283
kWh
|
$500
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $30,166 | - |
$23,102
526,248
kWh
|
$7,064
-
kW-mo/yr
|
- | - | - | - | - | |
07 | 2.2437: Recover waste heat from equipment | $12,615 | $1,500 |
$(-75.0)
(-1,702)
kWh
|
$(-16.0)
-
kW-mo/yr
|
- |
$12,706
-
MMBtu
|
- | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $27,755 | $60,000 |
$22,791
519,156
kWh
|
$4,964
-
kW-mo/yr
|
- | - | - | - | - | |
09 | 2.4239: Eliminate or reduce compressed air usage | $35,495 | $1,200 |
$29,132
663,603
kWh
|
$6,363
-
kW-mo/yr
|
- | - | - | - | - | |
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,940 | - |
$3,294
75,037
kWh
|
$2,646
-
kW-mo/yr
|
- | - | - | - | - | |
11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,765 | $4,001 |
$1,734
39,501
kWh
|
$31
-
kW-mo/yr
|
- | - | - | - | - | |
12 | 2.6231: Utilize controls to operate equipment only when needed | $1,614 | $5,220 |
$1,614
36,759
kWh
|
- | - | - | - | - | - | |
13 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $127,137 | $75,000 |
$(-426.0)
(-9,698)
kWh
|
$(-1,249.0)
-
kW-mo/yr
|
- | - | - | $92,300 | $36,512 | |
14 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $386,941 | $554,028 |
$245,633
5,596,561
kWh
|
$53,512
-
kW-mo/yr
|
- | - | $69,900 | $17,896 | - | |
TOTAL RECOMMENDED | $977,649 | $907,828 |
$362,083
8,249,206
kWh
|
$106,116
-
kW-mo/yr
|
$18,323 |
$274,519
-
MMBtu
|
$69,900 | $110,196 | $36,512 | ||
TOTAL IMPLEMENTED | $609,534 | $832,528 |
$301,298
6,864,569
kWh
|
$91,628
-
kW-mo/yr
|
- | - | $69,900 | $110,196 | $36,512 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs