Assessment Year | 2022 |
---|---|
Principal Product | Travel Trailers and Motor Homes |
NAICS | 336214: Travel Trailer and Camper Manufacturing |
SIC | 3716: Motor Homes |
Sales Range | $50 M to 100M |
# of Employees | 350 |
Plant Area |
286,000
ft2
|
Annual Production | 4,604
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $130,072 | 3,389,062 |
kWh
|
$0.038 |
Electricity Demand | $224,865 | 11,243 |
kW-mo/yr
|
$20.00 |
Electricity Fees | $1,200 | - |
|
- |
Natural Gas | $44,385 | 9,816 |
MMBtu
|
$4.52 |
TOTAL YEARLY COSTS | $400,522 | |||
RECOMMENDED SAVINGS* | $53,096 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,384 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7442: Keep doors and windows shut when not on use | $11,472 | - | - | - |
$11,472
-
MMBtu
|
- | - | |
02 | 2.7231: Use radiant heater for spot heating | $4,443 | - |
$169
4,410
kWh
|
- |
$4,274
-
MMBtu
|
- | - | |
03 | 2.7224: Reduce space conditioning during non-working hours | $573 | - | - | - |
$573
-
MMBtu
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,218 | $360 |
$885
23,100
kWh
|
$1,333
-
kW-mo/yr
|
- | - | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $1,843 | - |
$735
19,199
kWh
|
$1,108
-
kW-mo/yr
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $725 | $1,500 | - | - |
$725
-
MMBtu
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $10,730 | $31,075 |
$4,281
111,788
kWh
|
$6,449
-
kW-mo/yr
|
- | - | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,596 | - |
$1,036
27,048
kWh
|
$1,560
-
kW-mo/yr
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,496 | $1,515,645 |
$5,849
152,716
kWh
|
$8,811
-
kW-mo/yr
|
- | $2,113 | $1,723 | |
TOTAL RECOMMENDED | $53,096 | $1,548,580 |
$12,955
338,261
kWh
|
$19,261
-
kW-mo/yr
|
$17,044
-
MMBtu
|
$2,113 | $1,723 | ||
TOTAL IMPLEMENTED | $32,384 | $1,515,645 |
$6,584
171,915
kWh
|
$9,919
-
kW-mo/yr
|
$12,045
-
MMBtu
|
$2,113 | $1,723 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs