Assessment Year | 2006 |
---|---|
Principal Product | low fractional hp motors |
NAICS | 335312: Motor and Generator Manufacturing |
SIC | 3621: Motors and Generators |
Sales Range | $10 M to 50M |
# of Employees | 219 |
Plant Area |
58,000
ft2
|
Annual Production | 850,000
pieces
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $144,260 | 1,564,500 |
kWh
|
$0.092 |
Electricity Demand | $28,938 | 4,807 |
kW-mo/yr
|
$6.02 |
Natural Gas | $16,157 | 1,376 |
MMBtu
|
$11.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $112,517 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 4.426: Modify workload | $35,100 | $3,200 | - | - | $35,100 | |
02 | 2.7232: Replace existing hvac unit with high efficiency model | $33,102 | $38,465 |
$26,102
283,712
kWh
|
$7,000
-
kW-mo/yr
|
- | |
03 | 2.3134: Shift from daytime to nighttime operation | $7,750 | $3,510 |
$4,006
43,537
kWh
|
$3,744
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,787 | $500 |
$2,909
31,616
kWh
|
$878
-
kW-mo/yr
|
- | |
05 | 2.3134: Shift from daytime to nighttime operation | $3,612 | $620 | - |
$3,612
-
kW-mo/yr
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $809 | $60 |
$611
6,644
kWh
|
$198
-
kW-mo/yr
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $363 | $500 |
$232
2,518
kWh
|
$131
-
kW-mo/yr
|
- | |
08 | 2.7135: Install occupancy sensors | $7,549 | $2,440 |
$7,549
82,103
kWh
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,445 | $51,983 |
$15,703
170,680
kWh
|
$4,742
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $112,517 | $101,278 |
$57,112
620,810
kWh
|
$20,305
-
kW-mo/yr
|
$35,100 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs