ITAC Assessment: UD0972
ITAC logo
ITAC Assessment: UD0972
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Bottled Liquor
NAICS 312140: Distilleries
SIC 2085: Distilled and Blended Liquors
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 110,000
ft2
Annual Production 800,000
units
Production Hrs. Annual 2,063
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,851 380,259
kWh
Electricity Demand $10,895 1,548
kW-mo/yr
Electricity Fees $720 -
Natural Gas $54,839 10,055
MMBtu
Waste Disposal Costs
Water Usage $11,220 2,703
Tgal
Water Disposal $25,763 1,801
Tgal
TOTAL YEARLY COSTS $155,288
RECOMMENDED SAVINGS* $24,748 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,451

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.8112: Combine utility meters $1,370 - - - $1,370 -
02 2.7224: Reduce space conditioning during non-working hours $5,897 - - - - $5,897
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $2,800 $3,250 - - - $2,800
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,266 $7,210 $7,622
55,851
kWh
$1,644
-
kW-mo/yr
- -
05 2.7134: Use photocell controls $3,473 $1,550 $3,473
25,449
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,488 $300 $1,111
8,141
kWh
$377
-
kW-mo/yr
- -
07 2.4221: Install compressor air intakes in coolest locations $454 $1,400 $339
2,484
kWh
$115
-
kW-mo/yr
- -
TOTAL RECOMMENDED $24,748 $13,710 $12,545
91,925
kWh
$2,136
-
kW-mo/yr
$1,370 $8,697
-
MMBtu
TOTAL IMPLEMENTED $19,451 $10,760 $8,733
63,992
kWh
$2,021
-
kW-mo/yr
- $8,697
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs