ITAC Assessment: DL0008
ITAC logo
ITAC Assessment: DL0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product non-alcoholic carbonated beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 60
Plant Area 150,000
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $358,951 4,170,861
kWh
Electricity Demand $3,940 949
kW-mo/yr
Electricity Fees $8,992 -
Natural Gas $212,998 39,452
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $168,808 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $120,247

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Consumption Savings
01 2.2437: Recover waste heat from equipment $40,014 $14,000 - $40,014
-
MMBtu
-
02 2.1224: Replace boiler $33,159 $102,000 - $33,159
-
MMBtu
-
03 2.8114: Change rate schedules or other changes in utility service $31,900 - $31,900
-
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $20,801 $175,000 $20,801
224,440
kWh
- -
05 3.4156: Use flow control valves on equipment to optimize water use $18,000 $1,000 - - $18,000
-
Tgal
06 2.1224: Replace boiler $12,509 $27,400 - $12,509
-
MMBtu
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,978 $2,105 $4,978
70,197
kWh
- -
08 2.2531: Re-size charging openings or add movable cover or door $3,800 $900 - $3,800
-
MMBtu
-
09 2.3511: Use plant owned transformers or lease transformers $2,893 $14,000 $2,893
31,450
kWh
- -
10 2.7135: Install occupancy sensors $754 $285 $754
8,200
kWh
- -
TOTAL RECOMMENDED $168,808 $336,690 $61,326
334,287
kWh
$89,482
-
MMBtu
$18,000
-
Tgal
TOTAL IMPLEMENTED $120,247 $193,290 $58,433
302,837
kWh
$43,814
-
MMBtu
$18,000
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs