ITAC Assessment: UD0945
ITAC logo
ITAC Assessment: UD0945
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Metal Forming and Coating
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $50
M
to 100
M
# of Employees 470
Plant Area 446,500
ft2
Annual Production 29,000,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $770,474 11,991,227
kWh
Electricity Demand $164,968 26,556
kW-mo/yr
Electricity Fees $1,874 -
Natural Gas $443,446 95,373
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $148,893 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,335

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2628: Utilize a less expensive cooling method $5,063 $8,000 $4,288
92,054
kWh
$775
-
kW-mo/yr
- -
02 2.2625: Chill water to the highest temperature possible $527 - $464
9,959
kWh
$63
-
kW-mo/yr
- -
03 2.5123: Reduce fluid flow rates $7,163 - $7,163
153,768
kWh
- - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $623 $30 - - $623
-
MMBtu
-
05 2.7314: Reduce ventilation air $77,225 $18,850 $8,612
184,886
kWh
$1,486
-
kW-mo/yr
$67,127
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $4,486 $8,972 $3,799
81,557
kWh
$687
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,610 - $1,610
34,560
kWh
- - -
08 2.4239: Eliminate or reduce compressed air usage $3,209 $3,951 $2,742
58,876
kWh
$467
-
kW-mo/yr
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,501 - $10,040
215,555
kWh
$1,181
-
kW-mo/yr
- $(-720.0)
10 2.2414: Use waste heat from hot flue gases to preheat $24,904 $23,828 - - $24,904
-
MMBtu
-
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,976 - $4,097
87,953
kWh
$1,879
-
kW-mo/yr
- -
12 2.4151: Develop a repair/replace policy $3,983 $20,370 $3,290
70,628
kWh
$693
-
kW-mo/yr
- -
13 2.6212: Turn off equipment during breaks, reduce operating time $2,867 $300 $2,867
61,545
kWh
- - -
14 2.6212: Turn off equipment during breaks, reduce operating time $756 $300 $582
12,504
kWh
$174
-
kW-mo/yr
- -
TOTAL RECOMMENDED $148,893 $84,601 $49,554
1,063,845
kWh
$7,405
-
kW-mo/yr
$92,654
-
MMBtu
$(-720.0)
TOTAL IMPLEMENTED $23,335 $28,400 $19,302
414,362
kWh
$3,410
-
kW-mo/yr
$623
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs