ITAC Assessment: UD0919
ITAC logo
ITAC Assessment: UD0919
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Medical, Dental and Animal Health Equipment
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 2599: Furniture and Fixtures, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 460
Plant Area 145,800
ft2
Annual Production 740,479
units
Production Hrs. Annual 4,080
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $212,587 5,479,894
kWh
Electricity Demand $188,520 14,244
kW-mo/yr
Natural Gas $320,537 39,288
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $133,592 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,140

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,757 - $684
22,783
kWh
$1,073
-
kW-mo/yr
- - - -
02 2.6212: Turn off equipment during breaks, reduce operating time $9,792 - - - $9,792
-
MMBtu
- - -
03 2.6231: Utilize controls to operate equipment only when needed $1,936 $50 $1,056
35,140
kWh
$880
-
kW-mo/yr
- - - -
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $29,266 $9,200 $10,557
351,437
kWh
$18,709
-
kW-mo/yr
- - - -
05 2.4226: Use / purchase optimum sized compressor $36,602 $22,000 $16,859
561,204
kWh
$19,743
-
kW-mo/yr
- - - -
06 2.4221: Install compressor air intakes in coolest locations $3,496 $2,295 $(-25.0)
(-836)
kWh
$(-42.0)
-
kW-mo/yr
$3,563
-
MMBtu
- - -
07 2.6212: Turn off equipment during breaks, reduce operating time $11,674 - $11,674
388,620
kWh
- - - - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,715 - $791
26,316
kWh
$924
-
kW-mo/yr
- - - -
09 2.4113: Install motor voltage controller on lightly loaded motors $4,591 $4,300 $1,721
57,287
kWh
$2,870
-
kW-mo/yr
- - - -
10 2.2426: Use waste heat from flue gases to heat space conditioning air $2,652 $5,000 - - $2,652
-
MMBtu
- - -
11 2.7121: Utilize daylight whenever possible in lieu of artificial light $242 $700 $242
8,042
kWh
- - - - -
12 3.1182: Make a new by-product $24,789 $46,000 $(-185.0)
(-6,160)
kWh
- $5,914
-
MMBtu
- $19,060 -
13 3.4133: Clean fouling from water lines regularly $5,080 $2,750 $(-71.0)
(-2,367)
kWh
$(-126.0)
-
kW-mo/yr
- $2,441
-
Tgal
- $2,836
-
Tgal
TOTAL RECOMMENDED $133,592 $92,295 $43,303
1,441,466
kWh
$44,031
-
kW-mo/yr
$21,921
-
MMBtu
$2,441
-
Tgal
$19,060 $2,836
-
Tgal
TOTAL IMPLEMENTED $56,140 $9,250 $24,762
824,296
kWh
$21,586
-
kW-mo/yr
$9,792
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs