ITAC Assessment: KU0237
ITAC logo
ITAC Assessment: KU0237
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PRINTING INK
NAICS
n/a
SIC 2893: Printing Ink
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area
n/a
Annual Production 804,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,909 529,308
kWh
Natural Gas $5,582 1,371
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,894 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,436

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,838 $600 $5,965
65,064
kWh
$(-1,127.0)
-
MMBtu
02 2.1123: Install automatic stack damper $399 $250 - $399
-
MMBtu
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,921 $2,000 $2,389
26,964
kWh
$(-468.0)
-
MMBtu
04 2.2437: Recover waste heat from equipment $407 $250 - $407
-
MMBtu
05 2.1123: Install automatic stack damper $313 $250 - $313
-
MMBtu
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,203 $200 $1,410
15,826
kWh
$(-207.0)
-
MMBtu
07 2.4231: Reduce the pressure of compressed air to the minimum required $390 $40 $390
4,396
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $519 - $519
5,862
kWh
-
09 2.4312: Improve lubrication practices $597 - $597
6,741
kWh
-
10 2.7261: Install timers and/or thermostats $3,307 $157 $519
5,862
kWh
$2,788
-
MMBtu
TOTAL RECOMMENDED $13,894 $3,747 $11,789
130,715
kWh
$2,105
-
MMBtu
TOTAL IMPLEMENTED $5,436 $607 $2,448
27,550
kWh
$2,988
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs