| Assessment Year | 2015 |
|---|---|
| Principal Product | Machined Parts |
| NAICS | 332721: Precision Turned Product Manufacturing |
| SIC | 3451: Screw Machine Products |
| Sales Range | $10 M to 50M |
| # of Employees | 77 |
| Plant Area |
60,000
ft2
|
| Annual Production | 15,216,906
pieces
|
| Production Hrs. Annual | 4,100
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $158,522 | 1,880,000 |
kWh
|
$0.084 |
| Electricity Demand | $35,984 | 5,688 |
kW-mo/yr
|
$6.33 |
| Natural Gas | $17,170 | 1,531 |
MMBtu
|
$11.21 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $106,332 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $68,499 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 3.4116: Meter recycled water (to reduce sewer charges) | $12,159 | $700 | - | - | - |
$12,159
-
Tgal
|
- | |
| 02 | 2.3134: Shift from daytime to nighttime operation | $1,098 | - | - |
$1,098
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7231: Use radiant heater for spot heating | $4,208 | $1,050 | - | - |
$4,208
-
MMBtu
|
- | - | |
| 04 | 2.4151: Develop a repair/replace policy | $58,864 | $75,499 |
$43,856
536,594
kWh
|
$15,008
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,325 | - |
$3,967
48,543
kWh
|
$1,358
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.4113: Install motor voltage controller on lightly loaded motors | $11,416 | $23,545 |
$9,339
114,263
kWh
|
$2,077
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.4226: Use / purchase optimum sized compressor | $8,952 | $45,000 |
$7,323
89,600
kWh
|
$1,629
-
kW-mo/yr
|
- | - | - | |
| 08 | 2.2437: Recover waste heat from equipment | $3,773 | $4,785 |
$(-318.0)
(-3,885)
kWh
|
$(-71.0)
-
kW-mo/yr
|
$4,162
-
MMBtu
|
- | - | |
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $537 | $1,000 |
$1,912
23,389
kWh
|
$425
-
kW-mo/yr
|
- | - | $(-1,800.0) | |
| TOTAL RECOMMENDED | $106,332 | $151,579 |
$66,079
808,504
kWh
|
$21,524
-
kW-mo/yr
|
$8,370
-
MMBtu
|
$12,159
-
Tgal
|
$(-1,800.0) | ||
| TOTAL IMPLEMENTED | $68,499 | $81,284 |
$49,417
604,641
kWh
|
$16,720
-
kW-mo/yr
|
$4,162
-
MMBtu
|
- | $(-1,800.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs