ITAC Assessment: MA0527
ITAC logo
ITAC Assessment: MA0527
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Plastic trays
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 192
Plant Area 110,000
ft2
Annual Production 8,000,000
pieces
Production Hrs. Annual 6,656
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $325,443 4,642,200
kWh
Electricity Demand $106,897 11,821
kW-mo/yr
Electricity Fees $(-2,235.0) -
Natural Gas $9,850 1,229
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,123 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $27,223 $224,940 $30,769
439,562
kWh
$7,239
-
kW-mo/yr
$(-10,785.0)
-
MMBtu
02 2.2437: Recover waste heat from equipment $8,470 $16,940 n/a $8,470
121,001
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,813 $23,660 $5,228
74,685
kWh
$585
-
kW-mo/yr
-
04 2.1117: Relocate oven / furnace to more efficient location $3,067 $150 $3,067
43,813
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,224 $2,070 $2,224
31,777
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,543 - $1,251
17,875
kWh
$292
-
kW-mo/yr
-
07 2.2625: Chill water to the highest temperature possible $1,300 - $1,300
18,577
kWh
- -
08 2.6218: Turn off equipment when not in use $869 - $869
12,413
kWh
- -
09 2.4221: Install compressor air intakes in coolest locations $477 $500 $775
11,074
kWh
- $(-298.0)
-
MMBtu
10 2.6218: Turn off equipment when not in use $137 - $137
1,955
kWh
- -
TOTAL RECOMMENDED $51,123 $268,260 $54,090
772,732
kWh
$8,116
-
kW-mo/yr
$(-11,083.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs