Assessment Year | 2003 |
---|---|
Principal Product | Plastic trays |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 192 |
Plant Area |
110,000
ft2
|
Annual Production | 8,000,000
pieces
|
Production Hrs. Annual | 6,656
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $325,443 | 4,642,200 |
kWh
|
$0.070 |
Electricity Demand | $106,897 | 11,821 |
kW-mo/yr
|
$9.04 |
Electricity Fees | $(-2,235.0) | - |
|
- |
Natural Gas | $9,850 | 1,229 |
MMBtu
|
$8.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,123 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $27,223 | $224,940 |
$30,769
439,562
kWh
|
$7,239
-
kW-mo/yr
|
$(-10,785.0)
-
MMBtu
|
|
02 | 2.2437: Recover waste heat from equipment | $8,470 | $16,940 | n/a |
$8,470
121,001
kWh
|
- | - |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,813 | $23,660 |
$5,228
74,685
kWh
|
$585
-
kW-mo/yr
|
- | |
04 | 2.1117: Relocate oven / furnace to more efficient location | $3,067 | $150 |
$3,067
43,813
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,224 | $2,070 |
$2,224
31,777
kWh
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,543 | - |
$1,251
17,875
kWh
|
$292
-
kW-mo/yr
|
- | |
07 | 2.2625: Chill water to the highest temperature possible | $1,300 | - |
$1,300
18,577
kWh
|
- | - | |
08 | 2.6218: Turn off equipment when not in use | $869 | - |
$869
12,413
kWh
|
- | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $477 | $500 |
$775
11,074
kWh
|
- |
$(-298.0)
-
MMBtu
|
|
10 | 2.6218: Turn off equipment when not in use | $137 | - |
$137
1,955
kWh
|
- | - | |
TOTAL RECOMMENDED | $51,123 | $268,260 |
$54,090
772,732
kWh
|
$8,116
-
kW-mo/yr
|
$(-11,083.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs