ITAC Assessment: CO0314
ITAC logo
ITAC Assessment: CO0314
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product asphalt and aggregate
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 4,560
ft2
Annual Production 1,300,000
ton
Production Hrs. Annual 2,130
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,460 1,548,359
kWh
Natural Gas $457,010 109,072
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $173,520 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $98,030

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $61,350 $51,760 - $61,350
-
MMBtu
02 2.2511: Insulate bare equipment $42,630 $7,900 - $42,630
-
MMBtu
03 2.2511: Insulate bare equipment $23,680 $19,840 - $23,680
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $23,400 $5,000 - $23,400
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $14,140 $2,470 - $14,140
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,240 $8,240 $4,240
42,790
kWh
-
07 2.4133: Use most efficient type of electric motors $4,080 $13,110 $4,080
38,687
kWh
-
TOTAL RECOMMENDED $173,520 $108,320 $8,320
81,477
kWh
$165,200
-
MMBtu
TOTAL IMPLEMENTED $98,030 $54,090 $8,320
81,477
kWh
$89,710
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs