Assessment Year | 2014 |
---|---|
Principal Product | Torque Converter Rebuilding |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
82,000
ft2
|
Annual Production | 172,800
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $31,221 | 1,533,818 |
kWh
|
$0.020 |
Electricity Demand | $108,040 | 7,464 |
kW-mo/yr
|
$14.47 |
Electricity Fees | $3,650 | - |
|
- |
Natural Gas | $66,711 | 10,850 |
MMBtu
|
$6.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,331 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,331 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,297 | $28,275 |
$1,562
77,037
kWh
|
$4,667
-
kW-mo/yr
|
- | $68 | - | |
02 | 2.4151: Develop a repair/replace policy | $269 | - |
$49
2,399
kWh
|
$220
-
kW-mo/yr
|
- | - | - | |
03 | 2.2514: Cover open tanks | $2,165 | $210 | - | - |
$2,165
-
MMBtu
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $762 | $1,000 |
$149
7,341
kWh
|
$613
-
kW-mo/yr
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $518 | - |
$101
4,992
kWh
|
$417
-
kW-mo/yr
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $314 | $500 |
$61
3,027
kWh
|
$253
-
kW-mo/yr
|
- | - | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,566 | - |
$306
15,091
kWh
|
$1,260
-
kW-mo/yr
|
- | - | - | |
08 | 3.5316: Contract a wood pallet recycling company | $4,440 | - | - | - | - | - | $4,440 | |
TOTAL RECOMMENDED | $16,331 | $29,985 |
$2,228
109,887
kWh
|
$7,430
-
kW-mo/yr
|
$2,165
-
MMBtu
|
$68 | $4,440 | ||
TOTAL IMPLEMENTED | $12,331 | $29,775 |
$1,873
92,397
kWh
|
$5,950
-
kW-mo/yr
|
- | $68 | $4,440 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs