ITAC Assessment: UD0907
ITAC logo
ITAC Assessment: UD0907
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Torque Converter Rebuilding
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 82,000
ft2
Annual Production 172,800
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,221 1,533,818
kWh
Electricity Demand $108,040 7,464
kW-mo/yr
Electricity Fees $3,650 -
Natural Gas $66,711 10,850
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,331 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,331

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,297 $28,275 $1,562
77,037
kWh
$4,667
-
kW-mo/yr
- $68 -
02 2.4151: Develop a repair/replace policy $269 - $49
2,399
kWh
$220
-
kW-mo/yr
- - -
03 2.2514: Cover open tanks $2,165 $210 - - $2,165
-
MMBtu
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $762 $1,000 $149
7,341
kWh
$613
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $518 - $101
4,992
kWh
$417
-
kW-mo/yr
- - -
06 2.4221: Install compressor air intakes in coolest locations $314 $500 $61
3,027
kWh
$253
-
kW-mo/yr
- - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,566 - $306
15,091
kWh
$1,260
-
kW-mo/yr
- - -
08 3.5316: Contract a wood pallet recycling company $4,440 - - - - - $4,440
TOTAL RECOMMENDED $16,331 $29,985 $2,228
109,887
kWh
$7,430
-
kW-mo/yr
$2,165
-
MMBtu
$68 $4,440
TOTAL IMPLEMENTED $12,331 $29,775 $1,873
92,397
kWh
$5,950
-
kW-mo/yr
- $68 $4,440
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs