ITAC Assessment: DL0060
ITAC logo
ITAC Assessment: DL0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Plastic Containers
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 100
Plant Area 9,999
ft2
Annual Production 9,999
units
Production Hrs. Annual 7,365
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $899,422 12,474,416
kWh
LPG $25,942 1,352
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $94,684 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,319

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $65,458 $79,125 $65,458
896,689
kWh
02 2.2511: Insulate bare equipment $12,645 $14,080 $12,645
173,225
kWh
03 2.7135: Install occupancy sensors $2,705 $422 $2,705
75,162
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,957 $26,400 $6,957
193,184
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,557 $8,750 $2,557
71,016
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,362 $21,600 $4,362
121,182
kWh
TOTAL RECOMMENDED $94,684 $150,377 $94,684
1,530,458
kWh
TOTAL IMPLEMENTED $11,319 $48,000 $11,319
314,366
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs