ITAC Assessment: UD0889
ITAC logo
ITAC Assessment: UD0889
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Metal Stamping products
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 58
Plant Area 63,000
ft2
Annual Production 14,000,000
pieces
Production Hrs. Annual 4,940
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,778 1,954,289
kWh
Electricity Demand $8,235 4,476
kW-mo/yr
Electricity Fees $28,215 -
Natural Gas $17,831 1,822
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,018 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,754

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $1,100 - $1,100
17,947
kWh
- - -
02 2.4151: Develop a repair/replace policy $654 $460 $623
10,164
kWh
$31
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,448 $1,000 $1,666
27,188
kWh
$82
-
kW-mo/yr
- $(-300.0)
04 2.7447: Install vinyl strip / high speed / air curtain doors $3,551 $3,500 - - $3,551
-
MMBtu
-
05 2.7224: Reduce space conditioning during non-working hours $1,355 $2,000 - - $1,355
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,219 $7,254 $4,737
77,285
kWh
$202
-
kW-mo/yr
- $280
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,401 $9,000 $4,066
66,344
kWh
$199
-
kW-mo/yr
- $136
08 2.7135: Install occupancy sensors $1,290 $1,400 $1,254
20,465
kWh
- - $36
TOTAL RECOMMENDED $19,018 $24,614 $13,446
219,393
kWh
$514
-
kW-mo/yr
$4,906
-
MMBtu
$152
TOTAL IMPLEMENTED $1,754 $460 $1,723
28,111
kWh
$31
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs