ITAC Assessment: UD0861
ITAC logo
ITAC Assessment: UD0861
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Steel and iron casting
NAICS 331513: Steel Foundries (except Investment)
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 278,000
ft2
Annual Production 7,500,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $358,219 9,551,154
kWh
Electricity Demand $253,185 28,188
kW-mo/yr
Natural Gas $167,022 32,502
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $85,639 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,924

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $15,708 - - $15,708
-
kW-mo/yr
- - -
02 2.2612: Use cooling tower water instead of refrigeration $8,039 $10,000 $(-1,361.0)
(-34,913)
kWh
$(-1,046.0)
-
kW-mo/yr
- $10,446
-
Tgal
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,507 $3,496 $3,823
52,769
kWh
$395
-
kW-mo/yr
- - $289
04 2.6218: Turn off equipment when not in use $3,025 - $3,025
77,584
kWh
- - - -
05 2.4151: Develop a repair/replace policy $1,371 $3,440 $991
25,412
kWh
$380
-
kW-mo/yr
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,167 - $843
21,624
kWh
$324
-
kW-mo/yr
- - -
07 2.4224: Upgrade controls on compressors $14,934 $2,000 $10,670
273,600
kWh
$4,264
-
kW-mo/yr
- - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $701 $1,000 $940
24,112
kWh
$361
-
kW-mo/yr
- - $(-600.0)
09 2.2514: Cover open tanks $6,896 - - - $6,896
-
MMBtu
- -
10 2.2514: Cover open tanks $6,786 - $6,786
109,457
kWh
- - - -
11 2.2414: Use waste heat from hot flue gases to preheat $6,234 $11,000 - - $6,234
-
MMBtu
- -
12 2.2414: Use waste heat from hot flue gases to preheat $5,453 $10,000 - - $5,453
-
MMBtu
- -
13 2.2514: Cover open tanks $4,954 - $4,954
127,015
kWh
- - - -
14 2.2414: Use waste heat from hot flue gases to preheat $4,482 $9,000 - - $4,482
-
MMBtu
- -
15 2.2522: Isolate hot or cold equipment $1,382 $1,500 - - $1,382
-
MMBtu
- -
TOTAL RECOMMENDED $85,639 $51,436 $30,671
676,660
kWh
$20,386
-
kW-mo/yr
$24,447
-
MMBtu
$10,446
-
Tgal
$(-311.0)
TOTAL IMPLEMENTED $56,924 $7,940 $28,209
658,804
kWh
$21,037
-
kW-mo/yr
$8,278
-
MMBtu
- $(-600.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs