ITAC Assessment: UD0825
ITAC logo
ITAC Assessment: UD0825
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Vacuum formed ceramic fiber high temperature insulation products
NAICS 327120: Clay Building Material and Refractories Manufacturing
SIC 3297: Nonclay Refractories
Sales Range $5
M
to 10
M
# of Employees 36
Plant Area 42,000
ft2
Annual Production 3,622,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,087 3,420,602
kWh
Electricity Demand $21,423 227
kW-mo/yr
Natural Gas $127,443 9,611
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,716 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,398 $100 - $5,398
-
kW-mo/yr
-
02 2.4131: Size electric motors for peak operating efficiency $2,976 $2,000 $2,473
32,248
kWh
$503
-
kW-mo/yr
-
03 2.4323: Use optimum size and capacity equipment $2,869 $10,000 $2,220
28,947
kWh
$649
-
kW-mo/yr
-
04 2.6212: Turn off equipment during breaks, reduce operating time $2,525 $100 $2,525
32,920
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,681 $25 $1,448
18,879
kWh
$233
-
kW-mo/yr
-
06 2.4154: Avoid rewinding motors more than twice $783 $971 $783
7,320
kWh
- -
07 2.7135: Install occupancy sensors $268 $75 $268
3,499
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $214 $60 $34
2,340
kWh
$180
-
kW-mo/yr
-
09 2.2414: Use waste heat from hot flue gases to preheat $11,851 $13,500 - - $11,851
-
MMBtu
10 2.2437: Recover waste heat from equipment $5,151 $1,200 - - $5,151
-
MMBtu
TOTAL RECOMMENDED $33,716 $28,031 $9,751
126,153
kWh
$6,963
-
kW-mo/yr
$17,002
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs