Assessment Year | 2010 |
---|---|
Principal Product | Blow molded, injection molded |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 291 |
Plant Area |
198,000
ft2
|
Annual Production | 13,476,977
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $450,369 | 9,616,440 |
kWh
|
$0.047 |
Electricity Demand | $359,547 | 2,122 |
kW-mo/yr
|
$169.44 |
Natural Gas | $44,725 | 4,423 |
MMBtu
|
$10.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $108,424 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $81,880 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $2,978 | - | - | - | $2,978 | - | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,468 | - |
$1,468
32,625
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,881 | - |
$12,131
269,568
kWh
|
$5,750
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,929 | - |
$5,853
130,062
kWh
|
$3,076
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,108 | - |
$2,693
59,836
kWh
|
$1,415
-
kW-mo/yr
|
- | - | |
06 | 2.2511: Insulate bare equipment | $22,144 | - |
$14,515
322,560
kWh
|
$7,629
-
kW-mo/yr
|
- | - | |
07 | 2.2511: Insulate bare equipment | $346 | - |
$227
5,040
kWh
|
$119
-
kW-mo/yr
|
- | - | |
08 | 2.2511: Insulate bare equipment | $6,179 | - |
$4,050
90,000
kWh
|
$2,129
-
kW-mo/yr
|
- | - | |
09 | 2.2628: Utilize a less expensive cooling method | $15,412 | - |
$(-1,073.0)
(-13,241)
kWh
|
- | - |
$16,485
-
Tgal
|
|
10 | 2.2625: Chill water to the highest temperature possible | $3,601 | - |
$3,601
80,016
kWh
|
- | - | - | |
11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,426 | - |
$7,426
165
kWh
|
- | - | - | |
12 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,512 | - |
$4,512
100,271
kWh
|
- | - | - | |
13 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $1,524 | - |
$1,524
33,869
kWh
|
- | - | - | |
14 | 2.7261: Install timers and/or thermostats | $10,027 | - |
$10,027
955
kWh
|
- | - | - | |
15 | 2.7444: Close holes and openings in building such as broken windows | $1,123 | - |
$1,123
107
kWh
|
- | - | - | |
16 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $766 | - |
$766
73
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $108,424 | - |
$68,843
1,111,906
kWh
|
$20,118
-
kW-mo/yr
|
$2,978 |
$16,485
-
Tgal
|
||
TOTAL IMPLEMENTED | $81,880 | - |
$47,525
901,846
kWh
|
$17,870
-
kW-mo/yr
|
- |
$16,485
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs