Assessment Year | 2006 |
---|---|
Principal Product | Air-Cooled Evaporators |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $100 M to 500M |
# of Employees | 215 |
Plant Area |
283,504
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 7,324
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $280,124 | 4,130,412 |
kWh
|
$0.068 |
Electricity Demand | $40,915 | 9,525 |
kW-mo/yr
|
$4.30 |
Electricity Fees | $2,207 | - |
|
- |
Natural Gas | $100,733 | 10,313 |
MMBtu
|
$9.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $128,931 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $69,707 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $61,122 | $180,000 |
$53,612
788,414
kWh
|
$5,556
-
kW-mo/yr
|
- | $(-2,294.0) | $4,248 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,585 | $53,959 |
$6,473
95,198
kWh
|
$1,027
-
kW-mo/yr
|
- | $329 | $756 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,649 | $1,500 |
$2,649
38,999
kWh
|
- | - | - | - | |
04 | 2.7261: Install timers and/or thermostats | $6,565 | - | - | - |
$6,565
-
MMBtu
|
- | - | |
05 | 2.4226: Use / purchase optimum sized compressor | $44,224 | $56,250 |
$9,515
139,929
kWh
|
$3,509
-
kW-mo/yr
|
- | - | $31,200 | |
06 | 2.1224: Replace boiler | $4,755 | $27,175 | - | - |
$2,755
-
MMBtu
|
$2,000 | - | |
07 | 2.6218: Turn off equipment when not in use | $1,031 | - |
$911
13,400
kWh
|
$120
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $128,931 | $318,884 |
$73,160
1,075,940
kWh
|
$10,212
-
kW-mo/yr
|
$9,320
-
MMBtu
|
$35 | $36,204 | ||
TOTAL IMPLEMENTED | $69,707 | $233,959 |
$60,085
883,612
kWh
|
$6,583
-
kW-mo/yr
|
- | $(-1,965.0) | $5,004 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs