ITAC Assessment: MA0584
ITAC logo
ITAC Assessment: MA0584
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Brown Aluminum Oxide Abrasives
NAICS 327910: Abrasive Product Manufacturing
SIC 3291: Abrasive Products
Sales Range $10
M
to 50
M
# of Employees 106
Plant Area 25,040
ft2
Annual Production 30,000
ton
Production Hrs. Annual 4,250
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,715 2,280,800
kWh
Electricity Demand $33,575 7,038
kW-mo/yr
Electricity Fees $1,200 -
Natural Gas $238,671 23,614
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,226 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,401

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $6,369 $2,100 - $6,369
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $3,880 $2,800 - $3,880
-
MMBtu
03 2.7231: Use radiant heater for spot heating $3,727 $11,326 - $3,727
-
MMBtu
04 2.2511: Insulate bare equipment $2,152 $1,400 - $2,152
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,098 $9,400 $2,098
25,500
kWh
-
TOTAL RECOMMENDED $18,226 $27,026 $2,098
25,500
kWh
$16,128
-
MMBtu
TOTAL IMPLEMENTED $12,401 $6,300 - $12,401
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs