Assessment Year | 1992 |
---|---|
Principal Product | STEEL/STAINLESS CASTINGS |
NAICS |
n/a
|
SIC | 3325: Steel Foundries, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 130 |
Plant Area |
n/a
|
Annual Production | 3,200,000
lb
|
Production Hrs. Annual | 2,160
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $398,475 | 9,117,233 |
kWh
|
$0.044 |
Natural Gas | $35,666 | 28,860 |
MMBtu
|
$1.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $80,252 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,839 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $29,220 | $100,000 |
$29,220
668,523
kWh
|
- | |
02 | 2.8114: Change rate schedules or other changes in utility service | $21,344 | - |
$22,244
-
kWh
|
$(-900.0) | |
03 | 2.3212: Optimize plant power factor | $10,253 | $6,000 |
$10,253
225,674
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,739 | $720 |
$5,739
131,301
kWh
|
- | |
05 | 2.4239: Eliminate or reduce compressed air usage | $3,407 | $250 |
$3,407
77,960
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $3,100 | $400 |
$3,100
70,926
kWh
|
- | |
07 | 2.4133: Use most efficient type of electric motors | $669 | $5,923 |
$669
15,240
kWh
|
- | |
08 | 2.4312: Improve lubrication practices | $3,215 | - |
$3,215
73,564
kWh
|
- | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,075 | - |
$2,075
47,479
kWh
|
- | |
10 | 2.7261: Install timers and/or thermostats | $1,230 | $1,505 |
$1,230
28,136
kWh
|
- | |
TOTAL RECOMMENDED | $80,252 | $114,798 |
$81,152
1,338,803
kWh
|
$(-900.0) | ||
TOTAL IMPLEMENTED | $8,839 | $1,120 |
$8,839
202,227
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs