ITAC Assessment: UD0806
ITAC logo
ITAC Assessment: UD0806
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Warm/cold forgings with machining
NAICS 332111: Iron and Steel Forging
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 148
Plant Area 138,000
ft2
Annual Production 34,200,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $925,609 10,620,400
kWh
Natural Gas $519,579 48,281
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $391,066 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $271,933

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3134: Shift from daytime to nighttime operation $169,364 - - $169,364
-
kW-mo/yr
- - - -
02 2.6218: Turn off equipment when not in use $75,878 - $75,878
1,764,600
kWh
- - - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $38,287 $157,500 $20,640
480,000
kWh
$17,647
-
kW-mo/yr
- - - -
04 2.2414: Use waste heat from hot flue gases to preheat $29,959 $10,000 - - $29,959
-
MMBtu
- - -
05 2.2514: Cover open tanks $11,513 $5,220 - - $11,513
-
MMBtu
- - -
06 2.2511: Insulate bare equipment $10,900 $5,010 - - $10,900
-
MMBtu
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $8,909 $17,420 $4,571
106,303
kWh
$3,474
-
kW-mo/yr
- - $864 -
08 2.3212: Optimize plant power factor $8,238 $64,000 $8,238
-
kWh
- - - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $8,111 $12,665 $5,770
134,180
kWh
$4,385
-
kW-mo/yr
- - $(-2,044.0) -
10 2.2414: Use waste heat from hot flue gases to preheat $6,025 $3,000 - - $6,025
-
MMBtu
- - -
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,165 $11,747 $5,165
120,120
kWh
- - - - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $3,652 $990 $2,087
48,524
kWh
$1,586
-
kW-mo/yr
- - $(-21.0) -
13 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,419 $748 $1,419
33,000
kWh
$2,000
-
kW-mo/yr
- - - -
14 2.7142: Utilize higher efficiency lamps and/or ballasts $3,400 $6,174 $2,291
53,276
kWh
$1,741
-
kW-mo/yr
- - $(-632.0) -
15 2.2223: Enhance sensitivity of temperature control and cutoff $2,991 $15,000 - - $2,991
-
MMBtu
- - -
16 3.4116: Meter recycled water (to reduce sewer charges) $2,636 $4,000 - - - $2,636
-
Tgal
- -
17 2.4226: Use / purchase optimum sized compressor $1,995 - $1,995
46,400
kWh
- - - - -
18 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $624 $1,000 $1,078
22,000
kWh
$946
-
kW-mo/yr
- - $(-1,200.0) $(-200.0)
TOTAL RECOMMENDED $391,066 $314,474 $129,132
2,808,403
kWh
$201,143
-
kW-mo/yr
$61,388
-
MMBtu
$2,636
-
Tgal
$(-3,033.0) $(-200.0)
TOTAL IMPLEMENTED $271,933 $38,249 $93,670
2,175,283
kWh
$181,496
-
kW-mo/yr
- - $(-3,033.0) $(-200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs