ITAC Assessment: UD0784
ITAC logo
ITAC Assessment: UD0784
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product PVC Fencing Products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 156
Plant Area 222,000
ft2
Annual Production 35,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $834,882 10,706,088
kWh
Natural Gas $73,266 6,072
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $329,051 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 4.623: Employ modular jigs to reduce process set-up time $123,480 $15,500 - - - - $123,480
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $46,375 $75,000 $27,972
756,000
kWh
$18,403
-
kW-mo/yr
- - -
03 2.3212: Optimize plant power factor $44,362 $13,500 - - $44,362 - -
04 2.3137: Use power during off-peak periods $19,834 - - $19,834
-
kW-mo/yr
- - -
05 2.4131: Size electric motors for peak operating efficiency $19,298 $4,400 $11,630
315,000
kWh
$7,668
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $15,375 $24,502 $8,684
235,200
kWh
$5,725
-
kW-mo/yr
- - $966
07 2.7231: Use radiant heater for spot heating $14,677 $26,000 - - - $14,677
-
MMBtu
-
08 2.4131: Size electric motors for peak operating efficiency $10,565 $24,000 $6,374
172,284
kWh
$4,191
-
kW-mo/yr
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $9,327 $17,943 $3,738
101,239
kWh
$5,589
-
kW-mo/yr
- - -
10 2.4226: Use / purchase optimum sized compressor $7,128 - $7,128
192,665
kWh
- - - -
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,237 $12,500 $3,785
102,312
kWh
$1,452
-
kW-mo/yr
- - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $5,465 $7,440 $3,712
100,585
kWh
$1,479
-
kW-mo/yr
- - $274
13 2.6231: Utilize controls to operate equipment only when needed $2,512 - $2,512
67,900
kWh
- - - -
14 2.4231: Reduce the pressure of compressed air to the minimum required $1,907 - $1,150
31,080
kWh
$757
-
kW-mo/yr
- - -
15 2.4221: Install compressor air intakes in coolest locations $1,701 $2,000 $1,026
27,720
kWh
$675
-
kW-mo/yr
- - -
16 2.4224: Upgrade controls on compressors $828 - $828
22,400
kWh
- - - -
17 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $980 $1,000 $591
15,960
kWh
$389
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $329,051 $223,785 $79,130
2,140,345
kWh
$66,162
-
kW-mo/yr
$44,362 $14,677
-
MMBtu
$124,720
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs