ITAC Assessment: UD0741
ITAC logo
ITAC Assessment: UD0741
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Farm Machinery
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 320,000
ft2
Annual Production 12,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $191,750 4,844,200
kWh
Electricity Demand $49,035 13,692
kW-mo/yr
Natural Gas $471,507 43,244
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $164,122 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,602

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1122: Re-size charging openings or add a movable door on equipment $65,250 $10,000 - - $65,250
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $43,883 $133,640 $36,888
696,000
kWh
$4,990
-
kW-mo/yr
- $2,005
03 2.7261: Install timers and/or thermostats $18,067 $110 - - $18,067
-
MMBtu
-
04 2.7442: Keep doors and windows shut when not on use $16,240 - - - $16,240
-
MMBtu
-
05 2.1113: Reduce combustion air flow to optimum $9,135 $2,800 - - $9,135
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,387 $3,150 $4,528
85,428
kWh
$612
-
kW-mo/yr
- $247
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,802 $840 $3,201
60,390
kWh
$601
-
kW-mo/yr
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,097 - $828
15,625
kWh
$269
-
kW-mo/yr
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,261 - $1,059
19,975
kWh
$202
-
kW-mo/yr
- -
TOTAL RECOMMENDED $164,122 $150,540 $46,504
877,418
kWh
$6,674
-
kW-mo/yr
$108,692
-
MMBtu
$2,252
TOTAL IMPLEMENTED $49,602 $3,750 $5,088
95,990
kWh
$1,072
-
kW-mo/yr
$43,442
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs