Assessment Year | 2006 |
---|---|
Principal Product | Metal Fabrication |
NAICS | 331221: Rolled Steel Shape Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 39 |
Plant Area |
60,000
ft2
|
Annual Production | 245,000
pieces
|
Production Hrs. Annual | 3,168
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $31,649 | 976,500 |
kWh
|
$0.032 |
Electricity Demand | $43,367 | 3,276 |
kW-mo/yr
|
$13.24 |
Natural Gas | $21,742 | 2,710 |
MMBtu
|
$8.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $66,927 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $48,276 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.632: Change operating conditions | $41,626 | $4,000 | - | - | - | $12,670 | $28,956 | |
02 | 2.7261: Install timers and/or thermostats | $11,417 | $3,300 | - | - |
$11,417
-
MMBtu
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,822 | $23,400 |
$2,403
65,894
kWh
|
$3,309
-
kW-mo/yr
|
- | $110 | - | |
04 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $3,397 | - | - | - |
$3,397
-
MMBtu
|
- | - | |
05 | 4.512: Condense operation into one building | $1,391 | $30 |
$208
6,627
kWh
|
$500
-
kW-mo/yr
|
$683
-
MMBtu
|
- | - | |
06 | 2.4224: Upgrade controls on compressors | $1,049 | $387 |
$400
12,913
kWh
|
$649
-
kW-mo/yr
|
- | - | - | |
07 | 2.4224: Upgrade controls on compressors | $873 | $1,900 |
$333
10,746
kWh
|
$540
-
kW-mo/yr
|
- | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $600 | - |
$229
7,380
kWh
|
$371
-
kW-mo/yr
|
- | - | - | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $539 | $540 |
$93
2,957
kWh
|
$446
-
kW-mo/yr
|
- | - | - | |
10 | 2.6214: Shut off pilots in standby equipment | $109 | - | - | - |
$109
-
MMBtu
|
- | - | |
11 | 2.7442: Keep doors and windows shut when not on use | $104 | - | - | - |
$104
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $66,927 | $33,557 |
$3,666
106,517
kWh
|
$5,815
-
kW-mo/yr
|
$15,710
-
MMBtu
|
$12,780 | $28,956 | ||
TOTAL IMPLEMENTED | $48,276 | $4,417 |
$837
26,920
kWh
|
$1,520
-
kW-mo/yr
|
$4,293
-
MMBtu
|
$12,670 | $28,956 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs