ITAC Assessment: UD0696
ITAC logo
ITAC Assessment: UD0696
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Aluminum Castings
NAICS 331524: Aluminum Foundries (except Die-Casting)
SIC 3365: Aluminum Foundries
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 30,000
ft2
Annual Production 2,300,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,557 1,587,937
kWh
Electricity Demand $51,867 4,284
kW-mo/yr
Natural Gas $296,256 40,284
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $114,417 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,359

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 4.446: Automate finishing process $50,850 $28,500 - - - $50,850 -
02 2.2514: Cover open tanks $19,683 $2,870 - - $19,683
-
MMBtu
- -
03 4.514: Re-arrange equipment layout to reduce handling costs $11,250 - - - - $11,250 -
04 3.1161: Eliminate/reduce an operation $9,375 - - - - $9,375 -
05 2.2414: Use waste heat from hot flue gases to preheat $9,026 $2,405 - - $9,026
-
MMBtu
- -
06 4.132: Purchase new equipment to reduce material use / cost $6,615 $13,230 - - $6,615
-
MMBtu
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,891 $600 $756
36,000
kWh
$1,135
-
kW-mo/yr
- - -
08 2.1116: Improve combustion control capability $1,617 - - - $1,617
-
MMBtu
- -
09 2.7122: Disconnect ballasts $1,218 $53 $609
19,320
kWh
$609
-
kW-mo/yr
- - -
10 2.7442: Keep doors and windows shut when not on use $845 - - - $845
-
MMBtu
- -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $631 $486 $252
12,000
kWh
$379
-
kW-mo/yr
- - -
12 2.7314: Reduce ventilation air $1,416 - - - - - $1,416
TOTAL RECOMMENDED $114,417 $48,144 $1,617
67,320
kWh
$2,123
-
kW-mo/yr
$37,786
-
MMBtu
$71,475 $1,416
TOTAL IMPLEMENTED $14,359 $1,086 $1,008
48,000
kWh
$1,514
-
kW-mo/yr
$2,462
-
MMBtu
$9,375 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs