Assessment Year | 1985 |
---|---|
Principal Product | HEAT SET YARN (NYLON) |
NAICS |
n/a
|
SIC | 2282: Yarn Texturizing, Throwing, Twisting, and Winding Mills |
Sales Range | $10 M to 50M |
# of Employees | 290 |
Plant Area |
n/a
|
Annual Production | 24,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $691,142 | 13,556,858 |
kWh
|
$0.051 |
Natural Gas | $118,079 | 27,500 |
MMBtu
|
$4.29 |
Fuel Oil #2 | $11,705 | 2,064 |
MMBtu
|
$5.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,398 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,948 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,225 | $500 | - |
$1,225
-
MMBtu
|
|
02 | 2.7251: Reduce air conditioning load by evaporating water from roof | $9,800 | $41,660 |
$9,800
191,970
kWh
|
- | |
03 | 2.1232: Keep boiler tubes clean | $3,730 | $5,000 | - |
$3,730
-
MMBtu
|
|
04 | 2.4133: Use most efficient type of electric motors | $4,283 | $2,928 |
$4,283
84,115
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $6,220 | $4,800 |
$6,220
123,095
kWh
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,490 | - |
$8,490
167,057
kWh
|
- | |
07 | 2.2437: Recover waste heat from equipment | $12,650 | $10,000 | - |
$12,650
-
MMBtu
|
|
TOTAL RECOMMENDED | $46,398 | $64,888 |
$28,793
566,237
kWh
|
$17,605
-
MMBtu
|
||
TOTAL IMPLEMENTED | $23,948 | $13,228 |
$18,993
374,267
kWh
|
$4,955
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs