ITAC Assessment: GT0252
ITAC logo
ITAC Assessment: GT0252
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product HEAT SET YARN (NYLON)
NAICS
n/a
SIC 2282: Yarn Texturizing, Throwing, Twisting, and Winding Mills
Sales Range $10
M
to 50
M
# of Employees 290
Plant Area
n/a
Annual Production 24,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $691,142 13,556,858
kWh
Natural Gas $118,079 27,500
MMBtu
Fuel Oil #2 $11,705 2,064
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,398 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,948

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,225 $500 - $1,225
-
MMBtu
02 2.7251: Reduce air conditioning load by evaporating water from roof $9,800 $41,660 $9,800
191,970
kWh
-
03 2.1232: Keep boiler tubes clean $3,730 $5,000 - $3,730
-
MMBtu
04 2.4133: Use most efficient type of electric motors $4,283 $2,928 $4,283
84,115
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $6,220 $4,800 $6,220
123,095
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $8,490 - $8,490
167,057
kWh
-
07 2.2437: Recover waste heat from equipment $12,650 $10,000 - $12,650
-
MMBtu
TOTAL RECOMMENDED $46,398 $64,888 $28,793
566,237
kWh
$17,605
-
MMBtu
TOTAL IMPLEMENTED $23,948 $13,228 $18,993
374,267
kWh
$4,955
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs