ITAC Assessment: UD0678
ITAC logo
ITAC Assessment: UD0678
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Aluminum cylinder heads, pistons and water passages
NAICS 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3365: Aluminum Foundries
Sales Range $100
M
to 500
M
# of Employees 392
Plant Area 169,000
ft2
Annual Production 8,560,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,404,850 29,754,740
kWh
Electricity Demand $89,670 48,400
kW-mo/yr
Natural Gas $867,604 159,122
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $146,736 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $107,515

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7224: Reduce space conditioning during non-working hours $57,760 - $24,310
552,558
kWh
- $33,450
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $27,800 $78,325 $25,970
590,400
kWh
$1,830
-
kW-mo/yr
- -
03 2.4226: Use / purchase optimum sized compressor $15,500 $980 $15,500
352,800
kWh
- - -
04 2.4239: Eliminate or reduce compressed air usage $12,900 $725 $12,050
273,600
kWh
$850
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $9,840 - $9,190
208,800
kWh
$650
-
kW-mo/yr
- -
06 2.4237: Substitute compressed air cooling with water or air cooling $6,015 $3,150 $5,545
126,000
kWh
$470
-
kW-mo/yr
- -
07 2.2211: Use optimum temperature $5,406 $500 $5,269
119,760
kWh
- - $137
-
Tgal
08 2.4235: Remove or close off unneeded compressed air lines $4,745 $2,400 $4,435
100,800
kWh
$310
-
kW-mo/yr
- -
09 2.7261: Install timers and/or thermostats $2,654 $1,000 - - $2,654
-
MMBtu
-
10 3.4116: Meter recycled water (to reduce sewer charges) $2,251 $2,000 - - - $2,251
-
Tgal
11 2.7122: Disconnect ballasts $1,865 $90 $1,742
39,600
kWh
$123
-
kW-mo/yr
- -
TOTAL RECOMMENDED $146,736 $89,170 $104,011
2,364,318
kWh
$4,233
-
kW-mo/yr
$36,104
-
MMBtu
$2,388
-
Tgal
TOTAL IMPLEMENTED $107,515 $7,195 $67,227
1,528,158
kWh
$1,933
-
kW-mo/yr
$36,104
-
MMBtu
$2,251
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs