| Assessment Year | 2003 |
|---|---|
| Principal Product | RV refrigeration units |
| NAICS | 335222: Household Refrigerator and Home Freezer Manufacturing |
| SIC | 3632: Household Refrigerators and HOme and Farm Freezers |
| Sales Range | $100 M to 500M |
| # of Employees | 285 |
| Plant Area |
176,000
ft2
|
| Annual Production | 130,000
pieces
|
| Production Hrs. Annual | 4,950
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $108,186 | 4,532,889 |
kWh
|
$0.024 |
| Electricity Demand | $141,474 | 10,200 |
kW-mo/yr
|
$13.87 |
| Natural Gas | $59,888 | 11,479 |
MMBtu
|
$5.22 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $135,790 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $54,577 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.621: Use fixtures to reduce machine changeout times | $34,103 | $28,000 |
$5,603
215,531
kWh
|
- | - | - | - | $28,500 | - | |
| 02 | 2.7261: Install timers and/or thermostats | $21,861 | $489 | - | - |
$21,861
-
MMBtu
|
- | - | - | - | |
| 03 | 3.5217: Reuse / recycle/ sell paper products | $18,425 | - | - | - | - | - |
$23,425
-
lb
|
$(-5,000.0) | - | |
| 04 | 2.7243: Improve air circulation with destratification fans / other methods | $20,186 | $72,000 |
$(-929.0)
(-35,743)
kWh
|
$(-819.0)
-
kW-mo/yr
|
$21,934
-
MMBtu
|
- | - | - | - | |
| 05 | 3.4114: Replace city water with recycled water via cooling tower | $17,000 | $20,000 | - | - | - |
$17,000
-
Tgal
|
- | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,580 | $53,130 |
$7,079
272,250
kWh
|
$8,501
-
kW-mo/yr
|
- | - | - | - | - | |
| 07 | 2.7122: Disconnect ballasts | $3,557 | $297 |
$1,616
62,172
kWh
|
$1,941
-
kW-mo/yr
|
- | - | - | - | - | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $1,700 | $470 |
$775
29,700
kWh
|
$925
-
kW-mo/yr
|
- | - | - | - | - | |
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,135 | $400 |
$515
19,800
kWh
|
$620
-
kW-mo/yr
|
- | - | - | - | - | |
| 10 | 2.2511: Insulate bare equipment | $1,019 | $252 |
$463
17,820
kWh
|
$556
-
kW-mo/yr
|
- | - | - | - | - | |
| 11 | 2.2511: Insulate bare equipment | $737 | $200 |
$335
12,870
kWh
|
$402
-
kW-mo/yr
|
- | - | - | - | - | |
| 12 | 2.7131: Add area lighting switches | $344 | $820 |
$164
6,325
kWh
|
$180
-
kW-mo/yr
|
- | - | - | - | - | |
| 13 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $143 | $400 |
$45
4,381
kWh
|
$68
-
kW-mo/yr
|
- | - | - | - | $30 | |
| TOTAL RECOMMENDED | $135,790 | $176,458 |
$15,666
605,106
kWh
|
$12,374
-
kW-mo/yr
|
$43,795
-
MMBtu
|
$17,000
-
Tgal
|
$23,425
-
lb
|
$23,500 | $30 | ||
| TOTAL IMPLEMENTED | $54,577 | $74,200 |
$8,704
334,620
kWh
|
$10,448
-
kW-mo/yr
|
- |
$17,000
-
Tgal
|
$23,425
-
lb
|
$(-5,000.0) | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs