ITAC Assessment: UD0677
ITAC logo
ITAC Assessment: UD0677
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product RV refrigeration units
NAICS 335222: Household Refrigerator and Home Freezer Manufacturing
SIC 3632: Household Refrigerators and HOme and Farm Freezers
Sales Range $100
M
to 500
M
# of Employees 285
Plant Area 176,000
ft2
Annual Production 130,000
pieces
Production Hrs. Annual 4,950
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,186 4,532,889
kWh
Electricity Demand $141,474 10,200
kW-mo/yr
Natural Gas $59,888 11,479
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $135,790 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,577

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.621: Use fixtures to reduce machine changeout times $34,103 $28,000 $5,603
215,531
kWh
- - - - $28,500 -
02 2.7261: Install timers and/or thermostats $21,861 $489 - - $21,861
-
MMBtu
- - - -
03 3.5217: Reuse / recycle/ sell paper products $18,425 - - - - - $23,425
-
lb
$(-5,000.0) -
04 2.7243: Improve air circulation with destratification fans / other methods $20,186 $72,000 $(-929.0)
(-35,743)
kWh
$(-819.0)
-
kW-mo/yr
$21,934
-
MMBtu
- - - -
05 3.4114: Replace city water with recycled water via cooling tower $17,000 $20,000 - - - $17,000
-
Tgal
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $15,580 $53,130 $7,079
272,250
kWh
$8,501
-
kW-mo/yr
- - - - -
07 2.7122: Disconnect ballasts $3,557 $297 $1,616
62,172
kWh
$1,941
-
kW-mo/yr
- - - - -
08 2.4221: Install compressor air intakes in coolest locations $1,700 $470 $775
29,700
kWh
$925
-
kW-mo/yr
- - - - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,135 $400 $515
19,800
kWh
$620
-
kW-mo/yr
- - - - -
10 2.2511: Insulate bare equipment $1,019 $252 $463
17,820
kWh
$556
-
kW-mo/yr
- - - - -
11 2.2511: Insulate bare equipment $737 $200 $335
12,870
kWh
$402
-
kW-mo/yr
- - - - -
12 2.7131: Add area lighting switches $344 $820 $164
6,325
kWh
$180
-
kW-mo/yr
- - - - -
13 2.4111: Utilize energy-efficient belts and other improved mechanisms $143 $400 $45
4,381
kWh
$68
-
kW-mo/yr
- - - - $30
TOTAL RECOMMENDED $135,790 $176,458 $15,666
605,106
kWh
$12,374
-
kW-mo/yr
$43,795
-
MMBtu
$17,000
-
Tgal
$23,425
-
lb
$23,500 $30
TOTAL IMPLEMENTED $54,577 $74,200 $8,704
334,620
kWh
$10,448
-
kW-mo/yr
- $17,000
-
Tgal
$23,425
-
lb
$(-5,000.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs