ITAC Assessment: OD0102
ITAC logo
ITAC Assessment: OD0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Carbonated Beverages
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 104
Plant Area 201,600
ft2
Annual Production 276,000,000
pieces
Production Hrs. Annual 6,528
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $177,715 8,475,381
kWh
Electricity Demand $248,130 21,866
kW-mo/yr
Electricity Fees $8,080 -
Natural Gas $121,798 39,168
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,090 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $3,060 $9,300 n/a $1,160
55,100
kWh
$1,025
-
kW-mo/yr
- - $875
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,455 $23,895 n/a $5,993
285,463
kWh
$5,462
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,629 $509 n/a $3,629
172,919
kWh
- - - -
04 3.8211: Convert to aqueous cleaning system $2,106 $1,300 n/a - - $2,106
-
gal
- -
05 3.5212: Regrind, reuse, or sell scrap plastic parts $6,840 - n/a - - - $6,840
-
lb
-
TOTAL RECOMMENDED $27,090 $35,004 $10,782
513,482
kWh
$6,487
-
kW-mo/yr
$2,106
-
gal
$6,840
-
lb
$875
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs