ITAC Assessment: UA0034
ITAC logo
ITAC Assessment: UA0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Steel Castings
NAICS 331513: Steel Foundries (except Investment)
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 101
Plant Area 100,000
ft2
Annual Production 1,500,000
lb
Production Hrs. Annual 2,295
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $204,785 2,856,384
kWh
Natural Gas $105,810 7,257
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,075 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,540

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,570 - $1,570
21,890
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,970 $1,500 $1,970
27,476
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,614 $14,475 $2,614
35,823
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,360 $27,038 $6,360
88,701
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,507 $1,344 $1,507
21,022
kWh
-
06 2.7134: Use photocell controls $1,372 $1,225 $1,372
19,133
kWh
-
07 2.2414: Use waste heat from hot flue gases to preheat $269 $2,100 - $269
-
MMBtu
08 2.7261: Install timers and/or thermostats $888 $680 $888
12,385
kWh
-
09 2.2437: Recover waste heat from equipment $1,640 $2,900 - $1,640
-
MMBtu
10 2.1321: Replace fossil fuel equipment with electrical equipment $3,885 $17,000 - $3,885
-
MMBtu
TOTAL RECOMMENDED $22,075 $68,262 $16,281
226,430
kWh
$5,794
-
MMBtu
TOTAL IMPLEMENTED $3,540 $1,500 $3,540
49,366
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs