ITAC Assessment: OK0727
ITAC logo
ITAC Assessment: OK0727
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Salts for livestock and water treatment
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 52,325
ft2
Annual Production 120,000
ton
Production Hrs. Annual 5,200
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $211,251 3,420,600
kWh
Natural Gas $316,916 29,980
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $163,688 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,766

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,431 $2,462 $4,035
72,307
kWh
$396
-
kW-mo/yr
- - -
02 2.7261: Install timers and/or thermostats $1,646 $75 - - - $1,646
-
MMBtu
-
03 2.6231: Utilize controls to operate equipment only when needed $12,463 $40,452 $10,476
187,745
kWh
- - $1,987
-
MMBtu
-
04 2.5124: Use gravity feeds wherever possible $10,056 $1,636 $10,342
185,340
kWh
$1,014
-
kW-mo/yr
- - $(-1,300.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,960 $8,407 $1,725
30,910
kWh
$235
-
kW-mo/yr
- - -
06 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $117,767 $838,833 - - $117,767 - -
07 2.2511: Insulate bare equipment $14,689 $7,635 - - - $14,689
-
MMBtu
-
08 2.7135: Install occupancy sensors $676 $535 $676
12,106
kWh
- - - -
TOTAL RECOMMENDED $163,688 $900,035 $27,254
488,408
kWh
$1,645
-
kW-mo/yr
$117,767 $18,322
-
MMBtu
$(-1,300.0)
TOTAL IMPLEMENTED $20,766 $10,172 $4,035
72,307
kWh
$396
-
kW-mo/yr
- $16,335
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs