Assessment Year | 2003 |
---|---|
Principal Product | Air cleaning equipment |
NAICS | 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing |
SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
125,000
ft2
|
Annual Production | 6,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $79,491 | 2,465,079 |
kWh
|
$0.032 |
Electricity Demand | $95,810 | 7,920 |
kW-mo/yr
|
$12.10 |
Natural Gas | $27,604 | 5,616 |
MMBtu
|
$4.92 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,033 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,589 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7243: Improve air circulation with destratification fans / other methods | $18,633 | $45,760 |
$(-150.0)
1,512
kWh
|
$3,347
-
kW-mo/yr
|
$14,986
-
MMBtu
|
$450 | |
02 | 4.111: Add equipment/ operators to reduce production bottleneck | $8,166 | $30,000 | - | - | - | $8,166 | |
03 | 4.454: Modify startup/shutdown times | $2,311 | - |
$2,311
88,920
kWh
|
- | - | - | |
04 | 2.2511: Insulate bare equipment | $1,353 | $2,168 | - | - |
$1,353
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,100 | $3,078 |
$362
13,908
kWh
|
$738
-
kW-mo/yr
|
- | - | |
06 | 2.7261: Install timers and/or thermostats | $753 | $1,048 |
$261
12,422
kWh
|
- |
$492
-
MMBtu
|
- | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $715 | - |
$715
27,500
kWh
|
- | - | - | |
08 | 2.7131: Add area lighting switches | $687 | $500 |
$169
8,052
kWh
|
$518
-
kW-mo/yr
|
- | - | |
09 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $623 | $604 |
$364
14,096
kWh
|
$259
-
kW-mo/yr
|
- | - | |
10 | 2.4221: Install compressor air intakes in coolest locations | $554 | $2,200 |
$182
7,015
kWh
|
$372
-
kW-mo/yr
|
- | - | |
11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $509 | $142 |
$112
4,381
kWh
|
$397
-
kW-mo/yr
|
- | - | |
12 | 2.4231: Reduce the pressure of compressed air to the minimum required | $481 | - |
$158
6,100
kWh
|
$323
-
kW-mo/yr
|
- | - | |
13 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $475 | $350 |
$475
18,270
kWh
|
- | - | - | |
14 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $360 | $100 |
$118
4,575
kWh
|
$242
-
kW-mo/yr
|
- | - | |
15 | 2.7122: Disconnect ballasts | $313 | $44 |
$103
3,965
kWh
|
$210
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $37,033 | $85,994 |
$5,180
210,716
kWh
|
$6,406
-
kW-mo/yr
|
$16,831
-
MMBtu
|
$8,616 | ||
TOTAL IMPLEMENTED | $10,589 | $32,344 |
$1,276
49,155
kWh
|
$1,147
-
kW-mo/yr
|
- | $8,166 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs