Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Skid mounted gas measurement system
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 128,476
ft2
Annual Production 72
units
Production Hrs. Annual 2,142
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,729 1,400,276
kWh
Natural Gas $31,445 7,321
MMBtu
Waste Disposal Costs
Water Usage $1,588 712
Tgal
TOTAL YEARLY COSTS $146,762
RECOMMENDED SAVINGS* $26,514 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,854 $3,960 $5,854
72,274
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,932 $35,800 $6,932
85,589
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $776 $2,508 $776
9,578
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,303 $7,634 $1,303
16,089
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,380 $6,786 $1,380
17,035
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,739 $2,695 $1,739
21,468
kWh
-
07 2.6232: Install set-back timers $1,719 $1,020 $1,268
15,659
kWh
$451
-
MMBtu
08 2.7211: Clean and maintain refrigerant condensers and towers $687 $2,800 $687
8,478
kWh
-
09 2.2414: Use waste heat from hot flue gases to preheat $6,124 $30,000 - $6,124
-
MMBtu
TOTAL RECOMMENDED $26,514 $93,203 $19,939
246,170
kWh
$6,575
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs