Assessment Year | 2017 |
---|---|
Principal Product | Skid mounted gas measurement system |
NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
128,476
ft2
|
Annual Production | 72
units
|
Production Hrs. Annual | 2,142
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $113,729 | 1,400,276 |
kWh
|
$0.081 | |
Natural Gas | $31,445 | 7,321 |
MMBtu
|
$4.30 | |
Waste Disposal Costs | |||||
Water Usage | $1,588 | 712 |
Tgal
|
$2.23 | |
TOTAL YEARLY COSTS | $146,762 | ||||
RECOMMENDED SAVINGS* | $26,514 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,854 | $3,960 |
$5,854
72,274
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,932 | $35,800 |
$6,932
85,589
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $776 | $2,508 |
$776
9,578
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,303 | $7,634 |
$1,303
16,089
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,380 | $6,786 |
$1,380
17,035
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,739 | $2,695 |
$1,739
21,468
kWh
|
- | |
07 | 2.6232: Install set-back timers | $1,719 | $1,020 |
$1,268
15,659
kWh
|
$451
-
MMBtu
|
|
08 | 2.7211: Clean and maintain refrigerant condensers and towers | $687 | $2,800 |
$687
8,478
kWh
|
- | |
09 | 2.2414: Use waste heat from hot flue gases to preheat | $6,124 | $30,000 | - |
$6,124
-
MMBtu
|
|
TOTAL RECOMMENDED | $26,514 | $93,203 |
$19,939
246,170
kWh
|
$6,575
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs