Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Aircraft propellers and drive systems
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 205
Plant Area 157,000
ft2
Annual Production 3,200
pieces
Production Hrs. Annual 4,312
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,925 5,087,506
kWh
Electricity Demand $199,567 13,656
kW-mo/yr
Natural Gas $102,645 11,770
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $127,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings
01 3.2123: Convert to high volume low pressure (hvlp) paint guns $64,277 $3,300 n/a - - - $64,277
-
gal
- -
02 3.6193: Install equipment (eg compactor) to reduce disposal costs $28,640 $1,000 n/a - - - - - $28,640
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $13,252 - n/a - $12,174
-
kW-mo/yr
- - $1,078 -
04 2.7261: Install timers and/or thermostats $10,178 $2,325 n/a - - $10,178
-
MMBtu
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,257 $363 n/a $1,008
45,815
kWh
$2,249
-
kW-mo/yr
- - - -
06 2.7111: Reduce illumination to minimum necessary levels $3,431 $7,030 n/a $1,233
56,056
kWh
$2,198
-
kW-mo/yr
- - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,965 - n/a $1,097
49,858
kWh
$1,868
-
kW-mo/yr
- - - -
08 2.4221: Install compressor air intakes in coolest locations $1,344 $2,000 n/a $499
22,663
kWh
$845
-
kW-mo/yr
- - - -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $359 $30 n/a $129
5,864
kWh
$230
-
kW-mo/yr
- - - -
10 2.4322: Use or replace with energy efficient substitutes $207 $250 n/a $207
7,405
kWh
- - - - -
TOTAL RECOMMENDED $127,910 $16,298 $4,173
187,661
kWh
$19,564
-
kW-mo/yr
$10,178
-
MMBtu
$64,277
-
gal
$1,078 $28,640
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs