ITAC Assessment: IC0009
ITAC logo
ITAC Assessment: IC0009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Metal Plating and Polishing
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 50,000
ft2
Annual Production 10,500,000
lb
Production Hrs. Annual 3,060
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,236 5,106,331
kWh
Electricity Demand $184,601 14,745
kW-mo/yr
Electricity Fees $49,196 -
Natural Gas $225,553 52,300
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $235,176 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,609

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.1113: Reduce combustion air flow to optimum $703 $1,500 - - $703
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,338 $1,000 $4,040
126,247
kWh
$5,298
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $1,325 $115 $574
17,958
kWh
$751
-
kW-mo/yr
- - -
04 2.2511: Insulate bare equipment $423 $1,863 - - $423
-
MMBtu
- -
05 2.2511: Insulate bare equipment $749 $201 - - $749
-
MMBtu
- -
06 2.2511: Insulate bare equipment $1,096 $3,753 - - $1,096
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,742 $6,722 $641
20,027
kWh
$1,101
-
kW-mo/yr
- - -
08 2.2443: Re-use or recycle hot or cold process exhaust air $28,900 $206,000 - - $28,900
-
MMBtu
- -
09 4.447: Automate payroll system $37,300 $9,195 - - - $32,400 $4,900
10 4.426: Modify workload $153,600 $57,100 - - - $86,000 $67,600
TOTAL RECOMMENDED $235,176 $287,449 $5,255
164,232
kWh
$7,150
-
kW-mo/yr
$31,871
-
MMBtu
$118,400 $72,500
TOTAL IMPLEMENTED $49,609 $17,512 $4,040
126,247
kWh
$5,298
-
kW-mo/yr
$2,971
-
MMBtu
$32,400 $4,900
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs