ITAC Assessment: MO0073
ITAC logo
ITAC Assessment: MO0073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product LITHOGRAPH PLATES
NAICS
n/a
SIC 3555: Printing Trades Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 15,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $297,835 4,378,077
kWh
Natural Gas $71,816 17,063
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,576 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,429

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,242 $1,848 $1,242
18,171
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,294 - $1,294
19,050
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,565 $4,992 $1,565
23,154
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $838 - $904
13,189
kWh
- $(-66.0)
05 3.4115: Recover and reuse cooling water $2,686 - $573
8,499
kWh
- $2,113
06 2.6223: Schedule use of elevators to conserve energy $211 $314 $211
3,224
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $1,490 $275 $1,490
21,981
kWh
- -
08 2.1233: Analyze flue gas for proper air/fuel ratio $1,250 $1,200 - $1,250
-
MMBtu
-
TOTAL RECOMMENDED $10,576 $8,629 $7,279
107,268
kWh
$1,250
-
MMBtu
$2,047
TOTAL IMPLEMENTED $6,429 $7,115 $6,495
95,545
kWh
- $(-66.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs