Assessment Year | 1992 |
---|---|
Principal Product | LITHOGRAPH PLATES |
NAICS |
n/a
|
SIC | 3555: Printing Trades Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
n/a
|
Annual Production | 15,000
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $297,835 | 4,378,077 |
kWh
|
$0.068 |
Natural Gas | $71,816 | 17,063 |
MMBtu
|
$4.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,576 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,429 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,242 | $1,848 |
$1,242
18,171
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,294 | - |
$1,294
19,050
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,565 | $4,992 |
$1,565
23,154
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $838 | - |
$904
13,189
kWh
|
- | $(-66.0) | |
05 | 3.4115: Recover and reuse cooling water | $2,686 | - |
$573
8,499
kWh
|
- | $2,113 | |
06 | 2.6223: Schedule use of elevators to conserve energy | $211 | $314 |
$211
3,224
kWh
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $1,490 | $275 |
$1,490
21,981
kWh
|
- | - | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,250 | $1,200 | - |
$1,250
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $10,576 | $8,629 |
$7,279
107,268
kWh
|
$1,250
-
MMBtu
|
$2,047 | ||
TOTAL IMPLEMENTED | $6,429 | $7,115 |
$6,495
95,545
kWh
|
- | $(-66.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs