| Assessment Year | 1987 |
|---|---|
| Principal Product | FABRICATED METAL PARTS |
| NAICS |
n/a
|
| SIC | 3465: Automotive Stampings |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
n/a
|
| Annual Production | 1,250,000,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $155,531 | 2,842,907 |
kWh
|
$0.055 |
| Natural Gas | $5,901 | 1,280 |
MMBtu
|
$4.61 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,651 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,175 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,756 | $300 |
$3,756
68,288
kWh
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $906 | $585 | - |
$906
-
MMBtu
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $1,612 | $4,800 |
$1,612
29,308
kWh
|
- | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $1,386 | $2,836 |
$1,386
25,205
kWh
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,322 | $1,120 |
$1,322
24,033
kWh
|
- | |
| 06 | 2.6122: Adjust vents to minimize energy use | $967 | - |
$967
17,585
kWh
|
- | |
| 07 | 2.4312: Improve lubrication practices | $951 | $1,500 |
$951
17,292
kWh
|
- | |
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $822 | $1,360 |
$822
14,947
kWh
|
- | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $790 | $192 |
$790
14,361
kWh
|
- | |
| 10 | 2.7492: Use proper thickness of insulation on building envelope | $139 | $45 |
$15
293
kWh
|
$124
-
MMBtu
|
|
| TOTAL RECOMMENDED | $12,651 | $12,738 |
$11,621
211,312
kWh
|
$1,030
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $10,175 | $8,357 |
$9,269
168,522
kWh
|
$906
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs