Assessment Year | 2003 |
---|---|
Principal Product | Canned chili and stew |
NAICS | 311613: Rendering and Meat Byproduct Processing |
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
140,000
ft2
|
Annual Production | 90,000,000
lb
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $410,447 | 3,650,015 |
kWh
|
$0.11 |
Electricity Demand | $122,086 | 9,247 |
kW-mo/yr
|
$13.20 |
Natural Gas | $569,925 | 80,788 |
MMBtu
|
$7.05 |
LPG | $1,223 | 88 |
MMBtu
|
$13.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $210,647 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,007 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $144,108 | $26,738 | - | - |
$144,108
-
MMBtu
|
- | |
02 | 2.7135: Install occupancy sensors | $1,596 | $619 |
$1,287
11,442
kWh
|
$309
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,281 | $564 |
$995
8,840
kWh
|
$286
-
kW-mo/yr
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,464 | $5,555 |
$4,879
43,369
kWh
|
$1,585
-
kW-mo/yr
|
- | - | |
05 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $3,013 | $2,748 |
$2,274
20,212
kWh
|
$739
-
kW-mo/yr
|
- | - | |
06 | 2.7134: Use photocell controls | $355 | $360 |
$209
1,858
kWh
|
$146
-
kW-mo/yr
|
- | - | |
07 | 2.2511: Insulate bare equipment | $2,530 | $3,638 | - | - |
$2,530
-
MMBtu
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,502 | $19,608 |
$6,099
54,211
kWh
|
$1,403
-
kW-mo/yr
|
- | - | |
09 | 2.1224: Replace boiler | $39,608 | $155,089 | - | - |
$39,608
-
MMBtu
|
- | |
10 | 3.4115: Recover and reuse cooling water | $4,190 | $6,871 | - |
$158
-
kW-mo/yr
|
- |
$4,032
-
lb
|
|
TOTAL RECOMMENDED | $210,647 | $221,790 |
$15,743
139,932
kWh
|
$4,626
-
kW-mo/yr
|
$186,246
-
MMBtu
|
$4,032
-
lb
|
||
TOTAL IMPLEMENTED | $12,007 | $11,941 |
$7,153
63,581
kWh
|
$2,324
-
kW-mo/yr
|
$2,530
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs