Assessment Year | 2018 |
---|---|
Principal Product | Asphalt Shingles |
NAICS | 324122: Asphalt Shingle and Coating Materials Manufacturing |
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $100 M to 500M |
# of Employees | 78 |
Plant Area |
174,240
ft2
|
Annual Production | 1,245,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $258,338 | 4,416,386 |
kWh
|
$0.058 |
Electricity Demand | $55,491 | 9,750 |
kW-mo/yr
|
$5.69 |
Electricity Fees | $24,076 | - |
|
- |
Natural Gas | $204,466 | 43,084 |
MMBtu
|
$4.75 |
TOTAL YEARLY COSTS | $542,371 | |||
RECOMMENDED SAVINGS* | $32,087 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,277 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $8,902 | $12,504 | - | - |
$8,902
-
MMBtu
|
- | - | |
02 | 2.4131: Size electric motors for peak operating efficiency | $7,797 | $13,333 |
$2,645
45,231
kWh
|
$5,152
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,525 | $8,125 |
$6,678
113,006
kWh
|
$847
-
kW-mo/yr
|
- | - | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,908 | $12,825 |
$6,112
104,475
kWh
|
- |
$(-2,204.0)
-
MMBtu
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,955 | $4,730 |
$2,986
51,045
kWh
|
$560
-
kW-mo/yr
|
- | $456 | $(-47.0) | |
TOTAL RECOMMENDED | $32,087 | $51,517 |
$18,421
313,757
kWh
|
$6,559
-
kW-mo/yr
|
$6,698
-
MMBtu
|
$456 | $(-47.0) | ||
TOTAL IMPLEMENTED | $19,277 | $26,188 |
$12,309
209,282
kWh
|
$6,559
-
kW-mo/yr
|
- | $456 | $(-47.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs