ITAC Assessment: OR0703
ITAC logo
ITAC Assessment: OR0703
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Asphalt Shingles
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $100
M
to 500
M
# of Employees 78
Plant Area 174,240
ft2
Annual Production 1,245,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $258,338 4,416,386
kWh
Electricity Demand $55,491 9,750
kW-mo/yr
Electricity Fees $24,076 -
Natural Gas $204,466 43,084
MMBtu
TOTAL YEARLY COSTS $542,371
RECOMMENDED SAVINGS* $32,087 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,277

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2414: Use waste heat from hot flue gases to preheat $8,902 $12,504 - - $8,902
-
MMBtu
- -
02 2.4131: Size electric motors for peak operating efficiency $7,797 $13,333 $2,645
45,231
kWh
$5,152
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,525 $8,125 $6,678
113,006
kWh
$847
-
kW-mo/yr
- - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,908 $12,825 $6,112
104,475
kWh
- $(-2,204.0)
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,955 $4,730 $2,986
51,045
kWh
$560
-
kW-mo/yr
- $456 $(-47.0)
TOTAL RECOMMENDED $32,087 $51,517 $18,421
313,757
kWh
$6,559
-
kW-mo/yr
$6,698
-
MMBtu
$456 $(-47.0)
TOTAL IMPLEMENTED $19,277 $26,188 $12,309
209,282
kWh
$6,559
-
kW-mo/yr
- $456 $(-47.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs