ITAC Assessment: GT0625
ITAC logo
ITAC Assessment: GT0625
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Rotor Disks
NAICS
n/a
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $50
M
to 100
M
# of Employees 800
Plant Area 700,000
ft2
Annual Production 12,500
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $617,976 27,223,623
kWh
Electricity Demand $542,415 38,660
kW-mo/yr
Electricity Fees $69,623 -
Natural Gas $19,344 5,683
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $869,517 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $767,537

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 3.4155: Meter waste water $20,840 - - - - - - $20,840 - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $46,500 $137,700 $24,359
1,084,408
kWh
$19,920
-
kW-mo/yr
$2,221 - - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,080 $400 $1,962
82,356
kWh
- $118 - - - - -
04 3.5111: Filter and reuse hydraulic oil $19,800 $7,150 - - - - $1,650
-
gal
- $18,150 -
05 2.7314: Reduce ventilation air $8,640 $20,000 $800
33,411
kWh
- - $7,840
-
MMBtu
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,957 $5,695 $1,846
77,667
kWh
- $111 - - - - -
07 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $26,000 $1,780 - - - - $26,000
-
gal
- - -
08 4.653: Maintain/enlarge a stock of spare parts $743,700 - - - - - - - - $743,700
TOTAL RECOMMENDED $869,517 $172,725 $28,967
1,277,842
kWh
$19,920
-
kW-mo/yr
$2,450 $7,840
-
MMBtu
$27,650
-
gal
$20,840 $18,150 $743,700
TOTAL IMPLEMENTED $767,537 $13,245 $3,808
160,023
kWh
- $229 - $1,650
-
gal
- $18,150 $743,700
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs