Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Pressure senstive flexographic printing on labels, tapes and
NAICS
n/a
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 35,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,878 1,201,200
kWh
Electricity Demand $43,040 2,952
kW-mo/yr
Natural Gas $10,910 1,264
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,499 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,635

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 4.611: Begin a practice of predictive / preventative maintenance $49,350 $4,680 - - - $49,350
02 2.6212: Turn off equipment during breaks, reduce operating time $6,653 - $1,404
45,000
kWh
$5,249
-
kW-mo/yr
- -
03 2.6231: Utilize controls to operate equipment only when needed $3,326 $1,000 $702
22,500
kWh
$2,624
-
kW-mo/yr
- -
04 2.6122: Adjust vents to minimize energy use $2,451 $112 $232
5,158
kWh
$87
-
kW-mo/yr
$2,132
-
MMBtu
-
05 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $2,173 $364 $1,123
36,000
kWh
$1,050
-
kW-mo/yr
- -
06 2.7444: Close holes and openings in building such as broken windows $2,158 $1,050 - - $2,158
-
MMBtu
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,847 $42 $955
30,600
kWh
$892
-
kW-mo/yr
- -
08 2.4239: Eliminate or reduce compressed air usage $1,587 $423 $187
6,000
kWh
$1,400
-
kW-mo/yr
- -
09 2.5122: Replace high resistance ducts, pipes, and fittings $860 $250 $265
8,500
kWh
$595
-
kW-mo/yr
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $580 $2,526 $300
9,600
kWh
$280
-
kW-mo/yr
- -
11 2.4231: Reduce the pressure of compressed air to the minimum required $514 - $266
8,520
kWh
$248
-
kW-mo/yr
- -
TOTAL RECOMMENDED $71,499 $10,447 $5,434
171,878
kWh
$12,425
-
kW-mo/yr
$4,290
-
MMBtu
$49,350
TOTAL IMPLEMENTED $21,635 $5,767 $5,168
163,358
kWh
$12,177
-
kW-mo/yr
$4,290
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings